Laserfiche WebLink
must be completed, even if no asbestos was discovered in the survey. Example: stop work; contact <br />owner/consultuit and DSHS; demarcate area; secure critical barriers. <br />9) An asbestos survey/inspection must be performed prior to any renovation or demolition. A DSHS licensed inspector <br />must perform the inspection if the project is in a public building. Provide the DSHS Inspector License Number, if <br />required. If the survey/inspection was perfonned in a public building prior to January 1993, or if the project is not in a <br />public building, "N.A." should be placed in the space for the DSHS License Number. 7'he date that the survey was <br />perfonned must be provided. The analytical method used to detect the presence of asbestos must be checked. TAfiPR <br />requires that a DSHS licensed laboratory perform the analysis of samples from public buildings. Provide the DSHS <br />Laboratory Number ifthe samples are collected from a public building. Ifthere was no suspect material discovered, <br />such as a garage, built of concrete and steel only, indicate no suspect material found by the license number. The <br />assumption of asbestos-containing building material (for renovations) in a public building must be made by a DSHS <br />licensed inspector. The "yes" box would be checked, the date that the survey (assessment) was perfonned would be <br />provided, the DSHS Inspector License Number would be provided, and the "assumed" analytical method boY would <br />be checked on the notification form, for an assumption of any asbestos-containing materials that would be abated <br />during a renovation project. When an assumption of asbestos-containing material is done in a non-public <br />building, all of the above must be completed except for the DSHS Inspector and Laboratory License Numbers (not <br />required). <br />10) Include in this section the demolition and renovation techniques to be used and a description ofthe areas and types of <br />facility components, wliich will be affected by this work. The specific type of asbestos-containing building material <br />that will be abated must be listed. Example: Vinyl asbestos-containing floor tiles to be removed by wet methods <br />recommended by the Resilient Floor Covering Institute. <br />11) Describe the work practices and engineering controls selected to ensure compliance with the requirements of the <br />regulations, including both the asbestos removal and waste-handling emission control techniques. Example: describe <br />a glove-bag procedure, including the use of a HEPA vacuum. Work practices that vary from the provisions of <br />TAHPR, §295.60 must be clearly described in this section. <br />] 2) If asbestos is present, the chart must be completed. 1f no asbestos is present (a.s revealed by the survey), check the box <br />provided. Category I non-friable ACBM includes floor tile, when removed intact, floor tile mastic, gaskets, and <br />roofing material. Category II non-friable AGBM includes transite siding. Use the appropriate row to designaie <br />whether the "Category I or Category 11 non-friable ACBM to be removed" is located on the interior or exterior of the <br />building. IfCategory 1 or fl materials are to be sanded, gound, abraded, crumbled, pulverized, reduced to powder, or <br />have the potential to become friable because of the abatement procedures, then list them with RACM. " Category I <br />and Il NOT removed" would be listed for demolitions or for enclosure or encapsulation. (Transite does not remain <br />Category 11 during demolition and must be removed prior to demolition). "RACM NOT removed" would be listed for <br />enclosure or encapsulation or in the event of a demolition under very specific conditions (such as the demolition of a <br />structurally unsound building). RACM 0ff-Faciliry Component (material that is not attached to the facility) shall only <br />be measured in cubic feet or cubic meters. All other material must be measured in linear feet or meters (pipes) or in <br />square feet or meters (surface material). If an abatement will be performed in a portico, or a HVAC system that <br />conditions the inside of a public building, list the amount as "Interior Category I non-friable removed, Interior <br />Category II non-friable removed, or RACM to be removed", depending on the type of ACBM that will be removed. <br />The amounts listed should always reflect the TOTAL amount removed during the project. <br />13) Provide all information for the waste transporter. The TAHPR reyuires that a DSHS Licensed Transporter transport <br />ACBM from the public building removal site to the waste disposal site. Provide the license number ifthe project is a <br />public building. tf you are performing a demolition without ACBM you still need to list who will be transporting the <br />waste from the project site. If two waste transporters are utilized, one to transport to a holding site aiid one to <br />transport from tlie holdiiig site to the waste disposal site, list the first transporter on the notification. However, the <br />waste manifest must contain infonnation for both transporten. <br />14) Provide all information for the waste disposal site. State regulations require that all waste disposal sites be permitted <br />by the Teaas Commission on Environmental Quality (TCEQ), including disposal sites located at industrial facilities. <br />Provide the permit number. <br />UUU2ii <br />