My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-043-RES-Asbestos Abatement
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-043-RES-Asbestos Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:34:33 PM
Creation date
5/26/2009 3:43:30 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-043-RES
Doc Type
Resolution
CITY CLERK - Date
4/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brady Environmental Seivices, Inc. <br />1.1.9.4 All asbestos-containing waste materials shall be <br />removed from the site at or before the time of final <br />acceptance and properly disposed of within ten (10) <br />days of project completion. <br />1.1.10 Re-establishment of Work Area <br />1.1.10.1 Upon passing clearance testing in accordance with <br />Section 1.1.8, the contractor shall dismantle each <br />containment and re-establish each work area.. <br />1.1.11 Utilities <br />1.1.11.1 Electricity and water will be provided to the <br />contractor by the City of Paris. A pole to provide <br />power will be set up at the jobsite by the City of Paris. <br />It will be responsibility of the contractor to have a <br />licensed electrician set up set up GFCI distribution <br />panels to provide distribution for the project and for <br />the consultant's air monitoring equipment. <br />1.1.12 5ecurity <br />1.1.12.1 The contractor shall be responsible for 24-hour site <br />security through his employees and/or a contract <br />security service for all regulated areas and other areas <br />affected by contractor's work. Containment shall be <br />constructed so as to allow for the proper securing of <br />the building after work hours. <br />1.1.13 Notification <br />1.1.13.1 Notices under the NESHAP and TDSHS (TDSHS) <br />regulations have been filed by the consultant in a <br />timely manner as required for the asbestos removal to <br />start as directed by owner. The contractor shall be <br />responsible for obtaining and filing all additional <br />permits and notices where required by local <br />ordinances. <br />: _ -7- CS09055 <br />
The URL can be used to link to this page
Your browser does not support the video tag.