My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-043-RES-Asbestos Abatement
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-043-RES-Asbestos Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:34:33 PM
Creation date
5/26/2009 3:43:30 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-043-RES
Doc Type
Resolution
CITY CLERK - Date
4/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brady Environmental Services, Inc. <br />1.1.16 Exposure Monitoring <br />1.1.16.1 Personal samples shall be collected in accordance <br />with OSHA regulations during all abatement <br />operations. The contractor shall insure that personnel <br />responsible for collecting and analyzing samples are <br />properly licensed by the Texas Department of State <br />Health Services. The contractor shall post the sample <br />results for the workers to review on his notice board. <br />1.1.17 Personal Protection <br />1.1.17.1 The contractor's workers shall, at a minimum, be <br />required to wear disposable clothing and <br />MSI-IA/NIOSH approved Half-face Air Purifying <br />Respirators. The contractor bears all responsibility <br />for providing the maximum amount of respiratory <br />protection and other personal protective equipment <br />that he deems necessary. to adequately protect his <br />workers and the environment. <br />1.1.18 Air Monitoring <br />1.1.18.1 Baseline air samples shall be collected by the project <br />manager. A minimum of three baseline samples shall <br />be collected for each area affected by abatement work <br />as determined by the consultant. Samples will be <br />collected under normal building conditions prior to <br />the disturbance of the ACM. Baseline samples shall <br />be analyzed by PCM and the results made available to <br />the abatement contractor upon written request. <br />1.1.18.2 Ambient air samples shall be collected on a daily <br />basis during all work involving the disturbance of <br />asbestos- containing materials. Ambient samples <br />shall be collected at the following locations: <br />• Negative Air Discharge Locations <br />. Inside Containment <br />• Decon Entrance <br />• Bagout Exit Point <br />• Outside Containment <br />cs09055 <br />_ 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.