Laserfiche WebLink
Project Cost Estimate <br />Coileqiate Drive - Loop 286 to F.M. 1507 <br />Prepared By <br />Hayter Engineering Inc. <br />May 15, 2009 <br />Collector (39 FT) <br />Arterial (62 FT) <br />Construction Cost Estimate <br />Street <br />$922,000.00 <br />$1,343,000.00 <br />($9.85/SF) <br />($9.03/SF) <br />Stormdrain System <br />$506,000.00 <br />$506,000.00 <br />Water & Sewer Extension <br />$70,000.00 <br />$70,000.00 <br />Total Construction <br />$1,498,000.00 <br />$1,919,000.00 <br />Contingencies (15% Construction) <br />$224,700.00 <br />$287,800.00 <br />Professional Services <br />Design Surveying <br />By Others <br />By Others <br />Design <br />$129,900.00 <br />$129,900.00 <br />SW3P <br />$3,500.00 <br />$3,500.00 <br />Bid and Award <br />$6,500.00 <br />$6,500.00 <br />Construction Testing <br />By City <br />By City <br />Construction Review <br />$47,000.00 <br />$58,200.00 <br />Warranty Review <br />$600.00 <br />$600.00 <br />Total Professional Services <br />$187,500.00 <br />$198,700.00 <br />Totai Estimated Cost $1,910,200.00 $2,405,500.00 <br />Notes: <br />1. Estimate based on layout provided by City Engineer. <br />2. Estimate does not include relolcation of existing utilities. <br />t~() (t)j o 7 -1 <br />