My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
21-South Collegiate Drive project
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
06 June
>
06-08-2009
>
21-South Collegiate Drive project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 8:14:42 AM
Creation date
6/8/2009 8:25:54 AM
Metadata
Fields
Template:
AGENDA
Item Number
21
AGENDA - Type
MISCELLANEOUS
Description
South Collegiate Drive project
AGENDA - Date
6/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Cost Estimate <br />Coileaiate Drive - North of F.M. 15071300 LF <br />Prepared By <br />Hayter Engineering Inc. <br />May 15, 2009 <br />Construction Cost Estimate $512,000.00 <br />($8.41/SF) <br />Contingencies (15% Construction) $76,800.00 <br />Professional Services <br />Design Surveying By Others <br />Design $41,300.00 <br />SW3P $3,500.00 <br />Bid and Award (If bid separate from south portion) $6,500.00 <br />Construction Testing <br />By City <br />Construction Review <br />$23,000.00 <br />Warranty Review <br />$500.00 <br />Totai Professional Services <br />$74,800.00 <br />Total Estimated Cost $663,600.00 <br />Notes: <br />1. Estimate based on layout provided by City Engineer. <br />2. Estimate does not include relolcation of existing utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.