Laserfiche WebLink
ADDENDUM #1 <br />For the <br />2008-2009 Budget Year <br />Water and Wastewater <br />Capital Improvements <br />For the <br />City of Paris, Tezas <br />HEI # 180037-28B <br />June 2009 <br />The contract documents shall be changed as outlined below: <br />l. Replace the original bid schedule with the attached bid schedule. <br />2. All tapping sleeves and valves are to be provided by the OWNER. <br />3. All Certa-Lok pipe is to be provided by the OWNER. <br />4. Use 1" poly tubing as required by the construction standards on page 7 oFthe drawings instead of'/a" <br />as required on page 48 of the specifications. Other brands of poly tubing are acceptable to use as long <br />as they meet the requirements (isted for Drisco brand of tubing. <br />5. On pa;e 2 of the drawings (Cleve(and Street), install caps at 20`h Street, 22°d Str eet, and 24~' Street <br />where the drawings show to abandon the existing lines. <br />6. On page 3 of the drawings (Culbertson Street), install caps at 19'h Street, 22"d Street, and 24`h Street <br />where the drawings show to abandon the existing lines. <br />7. Wrapid Seal is to be used on pre-cast manholes at the joint between the manhole frame and the <br />manhole cone section when the manhole is not in the pavement. Wrapid Seal is also to be used at all <br />joints between pre-cast manhole sections. Wrapid Seal is not required on cast-in-place manholes if the <br />ring and cover is installed at the same time that the cone section is cast. The CONTRACTOR is to <br />supply the Wrapid Seal. <br />8. Pre-cast manhole bottom sections are not allowed due to the OWNER'S requirement that incoming <br />pipes be supported for 5 feet outside the manhole with a concrete cradle that is poured monolithically <br />with the base. <br />9. Page 73 of the specifications requires connections between existing sewer lines and manholes to use <br />ductile iron pipe. Change this requirement to PVC pipe instead of DIP. <br />10. Eliminate the inside manhole drop structure detail shown on page 5 of the drawings. Replace it with <br />the attached City of Paris standard detail. Provide SDR-35 PVC fittings. The OWNER will provide <br />the pipe. <br />11. At STA 12+17 on page 4 of the drawings, install by-pass piping around the existing manhole while it <br />is being removed and replaced. Remove the by-pass piping and connect the sewer lines to the new <br />manhole after successful testing of the manhole and the new sewer line has been completed. <br />Additionally, there is a 6" sewer line coming in at 12:00. Verify the depth before ordering pre-cast <br />manhole sections. <br />12. The tracer wire described on page 74 of the specifications shall be insulated. <br />13. The corrosion-resistant liner for pre-cast manhole sections shall be factory-applied. The factory shall <br />submit a statement documenting that the 28-day cure time was allowed to take place before the liner <br />was applied. On cast-in-place manholes the pipes and fittings will be installed through the manhole <br />and the tops will not be cut out until the concrete has cured 28 days and the w4~ls have been <br />thoroughly dried before applying the liner. <br />~ 000264 <br />