My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19-Water and Sewer Capital Improvement Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
07 July
>
07-13-2009
>
19-Water and Sewer Capital Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 7:55:07 AM
Creation date
7/10/2009 8:48:21 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
19.
Doc Type
Agenda
CITY CLERK - Date
7/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. A detail for the sewer line casing and casing spacer installation is attached. Use it for the sewer line <br />. crossing the drainage structure on page 4(Washington Street sewer line). The casing spacers for the <br />sewer line creek crossing shall meet the following requirements: <br />Casing spacers shall be used to install the carrier pipe inside the encasement pipe. Casing spacers <br />shall fasten tightly onto the carrier pipe so that when the carrier pipe is being installed the spacers <br />will not move along the pipeline. Casing spacers shall be doubled on each end of the encasement. <br />Each casing spacer shall be capable of providing support for the eazrier pipe in service at a <br />maximum spacing of 101. Calculations shall be provided to the ENGINEER by the casing spacer <br />manufacturer showing that the casing spacer will support the service load at the recommended <br />spacing, including a factor of safety of two (2). Casing spacers used under this specification shall <br />meet or exceed the specifications described herein as projection-type casing spacers. <br />Projection-type casing spacers shall be constructed of preformed secrions of high density <br />polyethylene. The flexible sections shall be joined together around the pipe to provide a minimum <br />of 16 plastic projections per spacer section. Projection-type casing spacers shall be "RACI" Type <br />F/G spacers, manufactured by Recon Pipe Corporation of Vernon, British Columbia, telephone <br />(604) 545-2227, or equivalent. <br />15. Water service details of page 7 of the drawings-The CONTRACTOR will be responsible for <br />installing the new service line to connect to the existing meter in the existing water meter box. If the <br />existing box is defective then the OWNER will provide a new meter box for the CONTRACTOR to <br />install. <br />16. The CONTRACTOR shall re-grass all areas disturbed by his construction activity. It shall be his <br />responsibility to reestablish grass cover to 75% of the disturbed area. Cool season grasses such as rye <br />and fescue will be required to be seeded if the construction is completed after September 15. Bermuda <br />grass will be used prior to that date. All fertilizing, soil testing, watering, disking, etc. that is required <br />to establish this amount of coverage is required. Contractor shall include in his bid enough to install <br />sod blocks of San Augustine grass on 1,000 total square feet in shaded areas under trees. Install sod <br />for 50°/a coverage of disturbed areas (checkerboard pattern). <br />17. All backfill in trenches where driveways or sidewalks are to be replaced will be installed in maximum <br />8" loose lifts of native material, compacted to a minimum of 95% standazd proctor density at -1 to <br />+3% of optimum moisture. The OWNER shall bear the cost of successful testing, and the <br />CONTRACTOR shall pay for tests that fail. <br />18. The OWNER will be responsible for removing and replacing all sidewalks shown to be removed and <br />replaced on the project. The CONTRACTOR shall be responsible for saw cutting and removing <br />portions of concrete driveways that are necessary to install pipe with trenching. The OWNER will be <br />responsible for making the concrete repairs at these locations. <br />19. With respect to bidding the fire hydrants, the fire hydrants and isolation gate valves will be furnished <br />by the OWNER, but not the ductile iron tee. <br />20. Although the OWNER will provide valves, the CONTRACTOR will provide the valve boxes, <br />extensions, and lids. ; -~*•~'d~~~~, <br />: . o E .o•O '••DF'}' <br />P T ~Z <br />HAYTER ENGINEERING ~•9s <br />tP <br />TBPE # F-000315 <br />~ <br />_ 1Cf-lA~~ PJ.TIBB~:TS~ <br />~ <br />ew « •r•.u••~ <br />r/ 7 <br />• 65484 Michael N Tibbets, P.E. ~G.$T~~ <br />ProjectManager ~ <br />, <br />2 <br />~ 000265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.