Laserfiche WebLink
4. BIDDER will complete the Work for the following price(s): <br />BID SCHEDULE <br />ESTIMATED UNIT TOTAL <br />NO. DESCRIPTION QUANTITY PRICE PRICE <br />Culbertson Street Water Line: <br />l. Mobilization. <br />2. 6" C-909 PVC, installed, <br />tested, cleaned up, complete <br />(pipe provided by OWNER). <br />3. 6" Horizontal drilled for 6" <br />C-900 DR-18 Certa-Lok PVC. <br />(pipe provided by OWNER) <br />4. Fire hydrant, installed, backfilled, <br />cleaned up, extensions as needed. <br />(fire hydrant provided by OWNER). <br />5. 6" Tappinb sleeve and valve, <br />installed, tested, complete. <br />(valve and sleeve provided by O`VNER). <br />6. 8" x 6" Tapping sleeve and valve, <br />installed, tested, complete. <br />(valve and sleeve provided by OWNER). <br />7. 6" Gate valve, installed, complete, <br />with box and pad. (valve and sleeve <br />provided by OWNER). <br />8. Ductile iron fittings (include <br />mechanical joint tllrust restraint <br />glands on all MJ fittings). <br />9. Repair asphalt areas, <br />cleaned up, complete. <br />10. Remove (but not replace) concrete <br />curb and gutter. <br />11. Short side service connections including <br />testing and pavement repair. <br />12. Long side service connections including <br />testing and pavement repair. <br />13. Abandon existing lines, including <br />all associated asphalt repairs, <br />cleaned up, complete. <br />' 1 LS <br />1,676 LF <br />60 LF <br />3 EA <br />3 EA <br />1 EA <br />5 EA <br />0.214 TN <br />65 SY <br />40 LF <br />19 EA <br />15 EA <br />$ $ <br />$ <br />$ <br />$ . <br />$ <br />r <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />6 EA $ $ <br />13 <br />M OOts2b6 <br />