Laserfiche WebLink
15. Abandon existing lines, including <br />all associated aspbalt IePairs, <br />cleaned up, complete. <br />16. Remove and replace manhole. <br />17. Additional depth of manhole. <br />lg. Remove concrete curb and gutter. <br />Washington Street Sewer Line: <br />1, 15" Ultra-Rib PVC, installed, tested, <br />cleaned up, complete (pipe provided <br />by OWNER). <br />2. 12 Ultra Rib PVC, installed, tested, <br />cleaned up, and complete (pipe <br />provided by OWNER). <br />3, 10" SDR-26 Class 160 PVC, installed, <br />tcstcd, cleaned up, complete (pipe <br />provided by OWNER). <br />4. 10" SDR-35 PVC, installed, fos ided <br />clcaned up, complete (p p p <br />by OWNER). <br />j. 10" Sewer service DIP, Class 350, <br />installed, tested, cteaned up, and <br />complete (pipe provided by OWNER). <br />Standard 6' manhole, installed, <br />tested, complete. <br />7. Additional depth of manhole. <br />g, 0-5' Trenching. <br />9. 5-8' Trenching. <br />10. 8-10' Trenching. <br />11. Trench safety. <br />12. 16" Steel casing. <br />13. Casing spacers for 10" SDR-26 <br />Class 160 PVC in 16" casing. <br />14. Creek crossing, 2-pipe support <br />piers, end treatment, installed, <br />cleaned up. <br />s EA <br />oa <br />1 EA <br />6 VF <br />no <br />4LF <br />89 <br />$ a ~ <br />$ QGO <br />„ Qa <br /> <br />128 LF <br /> <br />b <br />$ <br />173 LF <br />~p <br />$ f <br />u <br />$ <br />500 LF <br />; <br /> <br />Ub <br />499 LF <br /> <br />6 <br />90 LF <br />a <br />6 a <br /> <br />7 EA <br />$ oo-00 <br />o' <br />- <br />12 VF <br />0 <br />00 <br /> <br />261 LF <br />$-~-J- <br />$ -2- <br />552 LF <br />Ga <br /> <br />~o <br />$ ~O G'O~ ' <br />503 LF <br />$_1.~---~- <br />$ <br />1,055 LF <br />$ <br />.$d <br />$ <br />= <br />215 LF <br /> <br />$ <br />1 LS $ <br />vd <br />1 LS $~~-•v ~ $ -5----G~-~--- <br />M 000259 <br />15 <br />