Laserfiche WebLink
15. Remove existing manhole. 3EA <br />70 LF <br />16. Erosion control fence. <br />17. Stub-out and tie to existin8 1 EA <br />12 VCP. <br />18. Stub-out and tie to existing 1 EA <br />10 VCP. <br />19. Stub-out and tie to existing 1 EA <br />8" VCP. <br />oa <br />~ o <br />415 pU <br />$ [166. $ 4w_~ <br />oa <br />20. Stub-out and tie to existing 1 EA $~-~O $ <br />6" VCP. . <br />) 00 <br />21. Abandon old line. 1 EA $ ~ <br />~ a~ <br />22. Gravel drive repairs. 65 LF 7~ <br />1 EA $ 7---~~- = <br />23. Near side service transfer b 00 <br />24. Manhole drop structure 2 EA <br />'Tfivul«r cZ T4sU .~1 .D io <br />~ -u1 G rl ~l n c~.✓'.z ~ ~ J.¢ r~ ~ / ~ ~5 / ~r/ <br />TOTAL BID: hi ~ndr^z lar1~ ~o Ilc~ r^ ~ (FIGURES) <br />~ (USE WORDS) <br />5. BIDDER agrees that the Work will the Contract Timeeco eneesto run, as pro dedwintthe <br />105 calendar days after the date when <br />Gcneral Conditions. <br />BIDDER accepts the provisions of the Agreement as to $115 per calendar day liquidated damages <br />in the event of failure to complete the Work on time. <br />6. The following documents are attached to and made a condition of this BID: <br />(a) Required Bid Security in the form of tJ" , ci <br />7. Communications concerning this Bid shall be addressed to the address of BIDDER -indicated <br />below. <br />ontract, <br />8. The terms in this Bid, which are defined in the General in ~f ted t thn em n the General <br />included as part of the Contract Documents have the m gs ass&nConditions. <br />SUBMITTED on 20Q~_. <br />is for materials actually incorporate <br />Of the above total - Base Bid, $ ~ ~ is for all other costs. <br />in the Work, and $ <br />„ 000266 <br />16 <br />