Laserfiche WebLink
Attachment A <br />ATMOS ENERGY CORPORATION <br />MID TEX DNISION <br />REVISION NO: 0 <br />RIDER: <br />GCR - GAS COST RECOVERY <br />APPLICABLE T0: <br />All Cities Except Dallas <br />EFFECTIVE DATE: <br />Bilis Rendered on or after 81112008 <br />PAGE: 70 <br />Pi eline Cost Rate Class <br />Allocation Factor D <br />Rate R - Residential Service <br />.634698 <br />Rate C - Commercia! Service <br />.302824 <br />Rate I- Industrial Service and Rate T- Trans ortation Senrice <br />.062478 <br />A= Adjustment applied in the current month to correct for the difference between the actual and <br />estimated pipeline cost revenue of the second preceding month, calculated by the formula: <br />A = R - (C - A2), where: <br />R= Actual revenue received from the application of the PP component in the second preceding <br />month. <br />C= Actual pipeline costs for the second preceding month. <br />A2 = The adjustment (A) applied to the PP component in the second preceding month. <br />S= Estimated Mcf or MMBtu for the rate class for the current billing month. <br />The PCF is calculated to the nearest 0.0001 cent. <br />The Pipeline Cost to be billed is determined by multiplying the Mcf or MMBtu used by the appropriate <br />PCF. The Pipeline Cost is determined to the nearest whole cent. <br />Issued By: David J. Park Vice President, Rates and Regulatory Affairs <br />Date Issued: <br />- -144 <br />