My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-001 RES PROFESSIONAL SERVICE AGREEMENT BETWEEN COP AND HAYTER ENG FOR HANDICAP RAMP AT LAKE CROOK
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-001 RES PROFESSIONAL SERVICE AGREEMENT BETWEEN COP AND HAYTER ENG FOR HANDICAP RAMP AT LAKE CROOK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:05:43 PM
Creation date
1/25/2010 8:59:47 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
001
Doc Type
Resolution
CITY CLERK - Date
1/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
View images
View plain text
K HAYTER <br />ENGINEERING, INC. <br />CONSULTANTS PLANNEAS ENGINEERS <br />November 3, 2009 <br />Mr. Bill Loranger <br />Parks & Recreation Supervisar <br />City of Paris <br />50 West Hickory Street <br />Paris, TX 75460 <br />Re: Lake Crook Fishing Pier <br />Dear Bill: <br />4445 S.E. LOOP 286 <br />PARIS, TEXAS 75460 <br />(903) 785-0303 <br />FAX (903) 785-0308 <br />Thank you very much for selecting Hayter Engineering for the negotiations regarding the <br />planning and design of the Lake Crook Fishing Pier and associated facilities. We appreciated the <br />opportunity to meet with you to present our credentials and ideas in connection with the project, <br />and look forward to working with you for a successful facility. <br />We envision that the superstructure will be a combination of treated lumber and, where feasible, <br />"Trek," or similar composite material. The superstructure will be supported on concrete, steel, or <br />wooden piles, as determined best during the design phase. The pier will be designed to include <br />handicap accessible sections of railing. Approach sidewalks and the adjacent parking area will be <br />included in the design, and will be designed to meet the Texas Accessibility Standards. In <br />general terms, we talked about a T-shaped structure with a 60 foot run and a 60 foot crossbar. <br />This is subject to further refinement during the preliminary layout phase. <br />We have suggested a geotechnical report including a boring adjacent to the shoreline. This would <br />provide information for the design of the pilings. <br />We would meet with you and other City representatives as necessary during the project and we <br />would coordinate the work of the geotechnical engineer. <br />Bidding and construction review services would be provided by the City. However, we would <br />answer questions posed by bidders or the City during the bidding process, and we would be <br />available to review shop drawings or submittals from the contractor during the initial phase of <br />construction. Visits to the site required during construction would be at your request and would <br />be billed on an hourly basis. <br />Service SiiTCe 1957 <br />TBPE F-000315 E X H f B!T ..A <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).