Laserfiche WebLink
Bill Loranger <br />November 3, 2009 <br />Page 2 <br />We are prepared to begin with the necessary topographic surveying within two weeks of your <br />notice to proceed, and I believe that we can complete the design of the project within 60 days <br />thereafter. Our fees for the proposed services are shown on Attachment A with hourly fees <br />shown on Attachment B. Attachment C is a proposed work authorization. We would be happy to <br />meet with you to discuss the proposed scope of services or any of the attachments. Once you are <br />satisfied with these documents we would appreciate receiving one executed copy of the work <br />agreement as authorization to proceed. <br />Sincerely, <br />GINEERING, INC. <br />i <br />I P' <br />~ `.1. <br />R. Reeves Hayt, er, P.E. <br />. <br />President 11 - <br />Enclosures <br />