My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Deliberate and act on a resolution approving and accepting a proposal for architural services from Denney Architects for the Bywaters Park
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
04 April
>
04/12/2010
>
18-Deliberate and act on a resolution approving and accepting a proposal for architural services from Denney Architects for the Bywaters Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:28:14 PM
Creation date
4/9/2010 6:19:36 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
4/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural Engineering Proposal Sheet 2 of 2 <br />_ TO: Mr. Paul K. Denney DATE: 01/25/2010 <br />Denney Architects <br />FROM: Donna Dietz, P.E. <br />Construction Document Services: <br />We do not recommend thai Option 3 be used, due to the lack of connectivity of the existing <br />limestone elements and the displacementlmovement that has occuxred. We do not feel that <br />the structure is sufficiently stable to perform construction while it remains erected. <br />Option 2 is our preferred system of support. With the expense of the dismantlement, <br />archival, restoration and reassembly, the most positive approach is always to provide a <br />deep foundation system and suspended foundation. <br />1. Kassaw and Dietz, Inc., proposes to perform the above described structura] <br />engineering work for Oprion 2 on an hourly basis with a not to exceed amount of <br />Six Thousand and Five Hundred Dollars (6,500). Our hourly rate is listed below. <br />Construction Phase Services Provided: <br />1. Kassaw and Dietz, Inc., will observe the foundation work as authorized by you, on <br />an hourly basis as needed. (See attached rate schedule). <br />Invoices will be submitted monthly and are due within sixty days of billing. <br />Principal <br />$140.00/Hr <br />Proj ect Engineer <br />$115.00/Hr. <br />Graduate Engineer <br />$ 85.00/Hr. <br />Draftsman <br />$ 65.00/Hr. <br />Clerical <br />$ 40.00/Hr. <br />Please let us know if this proposal meets your requirements. At that time, we will prepare a <br />Contract for your signature. <br />cc: File <br />000141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.