Laserfiche WebLink
Structural Engineering Proposal Sheet 2 of 2 <br />_ TO: Mr. Paul K. Denney DATE: 01/25/2010 <br />Denney Architects <br />FROM: Donna Dietz, P.E. <br />Construction Document Services: <br />We do not recommend thai Option 3 be used, due to the lack of connectivity of the existing <br />limestone elements and the displacementlmovement that has occuxred. We do not feel that <br />the structure is sufficiently stable to perform construction while it remains erected. <br />Option 2 is our preferred system of support. With the expense of the dismantlement, <br />archival, restoration and reassembly, the most positive approach is always to provide a <br />deep foundation system and suspended foundation. <br />1. Kassaw and Dietz, Inc., proposes to perform the above described structura] <br />engineering work for Oprion 2 on an hourly basis with a not to exceed amount of <br />Six Thousand and Five Hundred Dollars (6,500). Our hourly rate is listed below. <br />Construction Phase Services Provided: <br />1. Kassaw and Dietz, Inc., will observe the foundation work as authorized by you, on <br />an hourly basis as needed. (See attached rate schedule). <br />Invoices will be submitted monthly and are due within sixty days of billing. <br />Principal <br />$140.00/Hr <br />Proj ect Engineer <br />$115.00/Hr. <br />Graduate Engineer <br />$ 85.00/Hr. <br />Draftsman <br />$ 65.00/Hr. <br />Clerical <br />$ 40.00/Hr. <br />Please let us know if this proposal meets your requirements. At that time, we will prepare a <br />Contract for your signature. <br />cc: File <br />000141 <br />