Laserfiche WebLink
C. PROJECT COST EVALUATION (20 Points) <br />In the space below, provide an evaluation of the costs associated with the <br />proposed project, based on specific questions listed in the scoring criteria. <br />Please attach additional pages if needed. <br />Equipment <br />• Bobcat S250 Skid Steer Loader $25,552.80 <br />Operation <br />(to be paid by applicant) <br />• 72" Root Grapple Attachment $2,260 <br />• Advertisement $300 <br />• Extended 3 year warranty $1,500 <br />• Annual Equipment Maintenance- Loader $1,000 <br />• Annual Equipment Maintenance- Horizontal Cutter $4,000 <br />• Total Project Cost $34,612.80 <br />5 :-w <br />