Laserfiche WebLink
42 DIRECTOR OF ENGINEERING, PLANNING AND DEVELOPMENT designates foi- <br />deinolition various properties located throughout the city. Those designated properties <br />may be modified at any time during the course of the Contract by either addition or deletion <br />of properties, and the properties may be submitted to the CONTRACTOR in no particular <br />order and in no particular quantity at one time. <br />4.3 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this Article 4, that without exception the <br />Bid is premised upon performing and furnishing the Work required by the Contract <br />Documents and such means, inethods, techni9ues, sequences, or procedures of demolition <br />as may be indicated in or required by the Contract Documents, and that the Contract <br />Documents are sufficient in scope and detail to indicate and convey understanding of all <br />terms and conditions for performance and furnishing of the Work. <br />Interaretations and Addenda <br />5.1 All guestions about the meaning or intent of the Contract Documents are to be directed to <br />DIRECTOR OF ENGINEERING, PLANNING AND DEVELOPMENT. Interpretations <br />or clarifications considered necessary by DIRECTOR OF ENGINEERtNG, PLANNING <br />AND DEVELOPMENT in response to such questions wil] be issued by Addenda mailed or <br />delivered to all parties recorded by DIRECTOR OF ENGINEERING, PLANNING AND <br />DEVELOPMENT as having received the Bidding Documents. Questions received less <br />than seven (7) days prior to the date for opening of Bids may not be answered. Only <br />questions answered by formal written Addenda will be binding. Oral and other <br />interpretations or clarifications will be without legal effect. <br />5.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by <br />OWNER or DIRECTOR OF ENGINEERING, PLANNING AND DEVELOPMENT. <br />Contracti Time <br />6.1 After award and upon receipt by OWNER of all signed contracts and bond and other <br />documents associated with this project, DIRECTOR OF ENGINEERING, PLANNING <br />AND DEVELOPMENT will submit a list of structures to CONTRACTOR shown in order <br />of priority. Upon completion of each list, CONTRACTOR must contact DIRECTOR OF <br />ENGINEERING, PLANNING AND DEVELOPMENT for a new list of structures. <br />Nothing in these bid documents shall require OWNER to expend more than that amount <br />budgeted for this purpose as approved by the City Council of the City of Paris. <br />6.2 All work associated with this project must be completed within twelve (12) months from <br />the date of contract execution <br />3 <br />~ <br />70 <br />