Laserfiche WebLink
Bid Tabulation <br />City of Paris <br />Lake Crook Fishing Pier - Revised 6/22/10 <br />HEI #180044-280 <br />July 16, 2010 <br />3:00 n.m. <br />Bobby Smaliwood <br />Construction <br />We Build, Inc. <br />Item <br />Descri tion <br />Estimated <br />Quanti <br />Unit <br />Price <br />Total <br />Price <br />Unit <br />Price <br />Total <br />Price <br />1 <br />10" Diameter piling <br />20 EA <br />665.50 <br />13,310.00 <br />520.00 <br />10,400.00 <br />2 <br />Pier, including railings <br />1,280 SF <br />48.31 <br />61,836.80 <br />54.00 <br />69,120.00 <br />3 <br />Site work, grading, temporary erosion control <br />1 LS <br />7,865.00 <br />7,865.00 <br />25,095.00 <br />25,095.00 <br />4 <br />Sidewalk <br />1,175 SF <br />7.26 <br />8,530.50 <br />5.00 <br />5,875.00 <br />5 <br />Accessible parking space (concrete onl ) <br />1 LS <br />1,851.30 <br />1,851.30 <br />3,200.00 <br />3,200.00 <br />6 <br />Seed and mulch <br />1 LS <br />B Owner <br />B Owner <br />B Owner <br />B Owner <br />7 <br />Pavement marking and si nage <br />1 LS <br />B Owner <br />B Owner <br />B Owner <br />B Owner <br />ITOTAL BID <br />$93,393.60 <br />$113,690.00 <br />Deductive A/ternate: <br />D1 <br />Use hot dipped galvanized fasteners/hardware in <br />lieu of stainless steel <br />Deduct <br />0.00 <br />4,400.00 <br />TOTAL BID PLUS DEDUCT/VE ALTERNATE <br />$93,393.60 <br />$109,290.00 <br />