Laserfiche WebLink
A.GREEMENT <br />in the year 20150, by and between <br />day of <br />ans, <br />THIS AGREEMENT is dated as of the <br />exas a home rule municipal corporation ]ocated at 135 1 (hereStreetinaSE,fter P called <br />the City of Paris, T , TX 75460 (hereinafter called CITY) and <br />CONTRACTOR). <br />RACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />CITY and CONT , <br />as follows: <br />Article l. W4RK complete all Work as specified or indicated in the Contract Documents. <br />CONTRACTOR shall <br />The Work project is generally described as follows: <br />Stillhouse Road Widening - Phase 1 <br />Levi Lane to Lewis Lane <br />HEI #180046 <br />~ Article 2. ENGINEER Who is hereinafter <br />ineerin Inc., Paris, Texas, <br />The Project has been designed by Hayter Eng g, <br />R a nd who is to act as CITY'S represe~oa <br />called ENGINEER in11theutContract <br />~ ENGINEE <br />responsibilities and have the rights and authority assigne <br />ection with completion of the Work in accordance with the Contract <br />Documents in conn <br />1 Documents. - <br />Article 3. CONTRACT TIME <br />e substantially completed and ready for finalp e of the Not ce9o Proce~ed, <br />~ 3.1 The Work will b <br />days from the effective date of this Agreement or from the d <br />~ whichever is later. <br />es. CITY and CONTRACTOR recognize thaetwork ~f not completed <br />3.2 Liquidated Damag <br />this Agreement and that CITY ~'~'i11 s anfy e extens ons thereoftallowed in accordance lved <br />~ ficulties invo'with <br />within the times specified above, plu <br />the General Conditions. They also recooceeding t~heaactual plossense su and ff difered bh CIo £ CITY <br />~ in proving in a legal or arbitration p <br />delag ~ bnyut S not as a penalty) <br />Work is not completed on time. Accord dldam ge f forrequirin <br />ime <br />and CONTRACTOR agree that as l1q date that ex ires after the t <br />500 for each calendar day P <br />CONTRACTOR shall pay CITY S <br />! <br />specified. <br />` Article 4. CONTRACT PIRJCE <br />RACTOR for completion of the Work in accordance with the Contract <br />CITY shall pay CONT <br />~ Documents in cunent funds as follows: <br />19 <br />