My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-119 RES APPROVING THE BID AND AWARDING THE CONTRACT FOR THE STILLHOUSE ROAD WIDENING
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-119 RES APPROVING THE BID AND AWARDING THE CONTRACT FOR THE STILLHOUSE ROAD WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:25:26 PM
Creation date
1/12/2011 2:57:07 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />~ <br />shown on the Unit Price Bid Schedule included in the Contract I <br />At the unit pnces <br />Documents. <br />Article 5. PAYMEN <br />T PROCEDURES Genera CONTRACTOR shall submit Applications for Payment in accordance withoVhaed n the ' <br />Conditions. Applications for Payment will be processed by ENGINEER, as p <br />General Conditions. <br />all retain 10% of the amount'of each payment until finas subspta t ally complePte,~the <br />The CITY sh <br />of all Work covered by the Contract Docum e n t s. W h e n t h e W o r k <br />retained amount may be re duce d to 5%, at the CITY'S discretion. <br />Article 6. INTEREST <br />tract amount of this contract is less than $400,000, ~ excetedss$4001000, nod inter st <br />If the con <br />CONTRACTOR on retained money. When the contract amoun <br />will be paid unless required by law. <br />Article 7. CONTRACTOR'S REPR.ESENTATTONS <br />to induce CITY to enter into this Agreement, CONTRACTOR makes the following <br />In order <br />representations: <br />CONTRACTOR has familiarized himself with theions and LawsXand Re ulations that <br />7.1 <br />Documents, Work, site, locality, and all loeafo~arice or furnishing of the Work. <br />in any manner, ma3~ affect cost, progress, p sts <br />subsurface 7.2 CONTRACTOR has studied carefully all reports of expWn ctn a e cand onta ned or dent fied <br />conditions and drawings of physical conditions, if any, Contract in the Contract Documents, and accepts the dete a~ d in such f eports and d aW ngs <br />Documents of the extent of the technical data cont <br />upon which CONTRACTOR is entitled to rely. <br />responsibility <br />explorationor <br />7.3 CONTRACTOR has obtained and carefully studied n , or iassumes <br />obtaining and carefully studying) all such examinatio lement, those referred to above, which <br />tests, reports and studies in addition to, or to supp the pertain to the subsurface or physical conditions at or con~ig~°e Work asSCONTRACTOR <br />may affect the cost, progress, performance or furnishing <br />considers necessary for the performance or fuWith the other terms and ondrtions oflthe <br />within the Contract Time and in accordance <br />tract Documents, and no additional examinations, iai esti~gatiWnl; ebploratq n~edtesby <br />Con Studies or similar information or data , <br />reports, <br />CONTRACTOR for such purposes. <br />CTOR has reviewed and checked all informat~ion nadrQroundoFac'il tiesdl at tor <br />7.4 CONTRA <br />on the Contract Documents S iumes Spe pon~ibilityi for Ithe accurate location of all <br />contiguous to the site and a <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.