Laserfiche WebLink
<br /> <br /> <br /> Scope of Work - Asbestos Abatement Irerracon <br /> Grand Theatre ® 21 Larnar Avenue, Paris, Texas <br /> April 14, 2011 a Terracon Project No. 941076,15 <br /> Second Floor (see attached drawing) <br /> <br /> <br /> Vibration Isolator .........................................................1 <br /> <br /> NOTES: <br /> <br /> a) Prior to beginning any work on the exterior of the structure, the CONTRACTOR <br /> will install a six foot temporary fence around the proposed work area, which will <br /> include the sidewalk area. The inside of the temporary fence will be completely <br /> covered with black plastic that will serve as a visual barrier. <br /> <br /> b) CONTRACTOR will be responsible for site security throughout the remediation <br /> project. <br /> <br /> c) CONTRACTOR will avoid damaging the ceramic/metal (orange/blue) cap on the <br /> top of the parapet wall associated with the front fagade. The CONTRACTOR will <br /> <br /> also avoid damaging the ceramic signage and associated neon lighting <br /> associated with the exterior marquee. The CONTRACTOR will be responsible for <br /> any damage that occurs to the exterior marquee. <br /> <br /> d) Prior to beginning the exterior abatement a general CONTRACTOR will enclose <br /> the vertical marquee "Grand" sign within a hard barrier. <br /> <br /> e) CONTRACTOR is responsible for providing all scaffolding, ladders and/or <br /> staging necessary to accomplish the work of this contract. The type, erection and <br /> use of scaffolding, including provisions for fall protection and employee training, <br /> shall comply with OSHA 29 CFR 1962, SUBPART L. <br /> <br /> f) CONTRACTOR is responsible for Fall Protection for his employees. <br /> CONTRACTOR is solely responsible for protection CONTRACTOR's employees <br /> form fall hazards. Fall protections protocols must comply with all applicable <br /> provision of OSHA 29 CFR 1926.500, SUBPART L. Documentation of training for <br /> <br /> each employee will be provided prior to beginning work. <br /> g) Due to the deterioraton of interior building materials the work area will require <br /> <br /> extensive precleaning prior to beginning remediation activities. The precleaning <br /> may consist of the clean-up of asbestos, lead and fungal contaminated debris. <br /> These activities will be performed after the installation of critical barriers <br /> separating the lobby from the remainder of the first floor theater, and at the <br /> entrance to the lobby, and installing the three chambered decontamination <br /> systern. Placement in the work area of negative air machines which' will be <br /> exhausted to the outside. <br /> <br /> <br /> L- r n <br /> <br /> - 12'7 <br />