My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work - Asbestos Abatement Irerracon <br /> Grand Theatre a 21 Lamar Avenue, Paris, Texas <br /> April 14, 2011 ® Terracon Project No. 94107645 <br /> h) CONTRACTOR will be responsible for the cleaning/decontamination of identified <br /> <br /> items which the Owner intends to save due to their historical significance. These <br /> items may consist of signs, marquee letters, projectors and/or related equipment. <br /> Once these items are cleaned they will be stored in a designated area provided <br /> by the Owner. These items will be identified by the Consultant prior to beginning <br /> remediation. <br /> <br /> i) Remaining equipment, fixtures and items in the proposed works area are <br /> considered contaminated and will be disposed of asbestos waste. These items <br /> may consist of desks, concession stand equipment/signs, concession stand <br /> wood subfloor, refrigerator, ceiling grid, lightning, water fountains, etc. <br /> <br /> j) CONTRACTOR will demolish the brick walls that make-up the concession stand <br /> area. <br /> <br /> k) CONTRACTOR will provide a continuous fire watch whenever an active <br /> <br /> containment is in operation. <br /> 1) If the CONTRACTOR does not perform load out through the decontamination <br /> <br /> chamber a separate waste load out chamber will be connected to the work area, <br /> with material ingress and egress through a flapped doorway constructed of six <br /> millimeter polyethylene sheeting. The exit of the waste load out area will also be <br /> constructed with six millimeter polyethylene flapped doorway. The water used <br /> during the waste load out procedures as a result of cleaning the outside of the <br /> bags will be properly filtered prior to discharge. No personnel may use this for <br /> ingress or egress in the containment area. <br /> <br /> m) Drawings provided depict the general locations of the identified asbestos- <br /> containing materials (ACM's) to be abated. The drawings show the basic <br /> configuration of the identified ACM's and are provided for informational purposes. <br /> The CONTRACTOR will perform work for materials present, regardless of actual <br /> quantities or extent of material and no increase in Contract amount will be <br /> allowed for quantity adjustment. <br /> n) Owner will provide sources of power and water for the project, it will be the <br /> CONTRACTOR's responsibility to route each to the area of usage at the <br /> CONTRACTOR's expense. <br /> <br /> o) CONTRACTOR's fee will include the cost of the electrician/plumber expense for <br /> <br /> abatement area "make safe." <br /> <br /> p) CONTRACTOR will include the cost of the TDSHS notification fee in heir base <br /> bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.