My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work- Asbestos Abatement Irerracon <br /> Grand Theatre ® 21 Lamar Avenue, Paris, Texas <br /> April 14, 2011 ® Terracon Project No. 94107645 <br /> <br /> 4. The waste will be disposed in an approved landfill. The waste will be <br /> transported to the landfill in a lined closed top receptacle. Verification of <br /> disposal at the landfill will be provided to the OWNER by CONTRACTOR via <br /> the Uniform Hazardous Waste Manifest signed by the landfill. . <br /> <br /> 5. The waste will be transported to the landfill in a lined closed top receptacle. <br /> Verification of disposal at the landfill will be provided to the OWNER by <br /> CONTRACTOR via the Uniform Hazardous Waste Manifest. <br /> <br /> 3.6 Clearance <br /> <br /> Aggressive PCM clearance sampling will be conducted in accordance with the NIOSH <br /> 7400 Method, in each contained area in which abatement has occurred. <br /> <br /> <br /> 4.0 CONTRACTOR SUBMITTALS <br /> <br /> Submittals required for proper execution include but are not limited to the following: <br /> <br /> Pre-Construction Submittals (submitted to CONSULTANT): <br /> Regulatory Notification Information <br /> Plan of Action <br /> Fire Action Plan <br /> Emergency Phone List <br /> Project Schedule <br /> Copy of Written Respirator Program which conforms to 29 CFR 1910.134(b) <br /> <br /> OSHA Material Safety and Data Sheets (Product Handling) <br /> Negative Initial Exposure Assessment <br /> <br /> Construction Submittals (submitted to CONSULTANT before start of work on-site) <br /> Licenses: CONTRACTOR, Supervisor, Transporter(s) <br /> NESHAP Training Certificate <br /> Personal Air Monitoring Lab Results <br /> List of Workers <br /> Worker Registration Certificates <br /> Medical Examination Results <br /> Worker Training Certificates <br /> Respiratory Fit Test Certificate <br /> Employee Fall Protection Training <br /> Certificates of Worker Acknowledgement <br /> <br /> <br /> <br /> <br /> <br /> - ~~Grrouc;s <br /> ■ ■ -~_K= u~ <br /> <br /> 133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.