My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work - Asbestos Abatement Irerracon <br /> Grand Theatres 21 Lamar Avenue, Paris, Texas <br /> April 14, 2011 ® Terracon Project No. 94107645 <br /> PERSONAL MONITORING: <br /> <br /> <br /> The CONTRACTOR shall perform air monitoring as required to meet OSHA <br /> requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br /> fiber counts for types of respiratory protection provided. The OWNER will not be <br /> providing air monitoring services to meet these OSHA requirements. Note: Results of <br /> Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br /> samples are obtained. A listing of all personal monitoring results obtained during the <br /> project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br /> submittals. <br /> <br /> LABORATORY TESTING: <br /> <br /> The CONSULTANT will perform field analysis of the air samples. A microscope and <br /> field laboratory will be set up at the jobsite, at the option of the CONSULTANT, so that <br /> verbal reports on air samples can be obtained promptly after collection. <br /> <br /> Reports to the OWNER by the CONSULTANT will include air monitoring data and <br /> pertinent information on work being conducted such as: work hours, number of workers, <br /> <br /> procedures used, CONTRACTOR discrepancies and corrective measures, containment <br /> methods and construction, and amount of ACM removed. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> y ~ - <br /> <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.