My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> SCOPE OF WORK - LEAD PAINT ABATEMENT <br /> Grand Theatre <br /> 21 Lamar Avenue <br /> <br /> Paris, Texas <br /> Terracon Project No. 94107645 <br /> <br /> <br /> <br /> 1.0 INTRODUCTION <br /> <br /> The work will consist of the abatement of lead based paint (LBP) identified within the <br /> scope of work. The lead paint abatement design is dated April 11, 2011. The contractor <br /> performing the LBP abatement will be a TDSHS certified lead firm. During the LBP <br /> activities a TDSHS lead abatement supervisor will be on-site at all times and the work <br /> will only be performed by TDSHS lead certified workers. <br /> <br /> <br /> 2.0 MATERIAL DESCRIPTION AND QUANITITIES <br /> <br /> Briefly and without force and effect upon the contract documents, the work of the <br /> Contract can be summarized as including removal and disposal of damaged flaking lead <br /> containing paint associated with: <br /> <br /> Walls, Ceilings and Window/Door Frames <br /> <br /> The CONTRACTOR will perform work for materials and locations indicated, regardless <br /> of actual quantities, and no increase in Contract amount will be allowed for quantity <br /> adjustment. <br /> <br /> First Floor - Lobby/Small Office/Closet (see attached drawing) <br /> <br /> <br /> Lobby: <br /> Door frames/jambs <br /> Ceilings <br /> <br /> Small Office/Closet: <br /> Door frames/jambs <br /> Walls and Ceilings <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.