My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work - Lead Paint Abatement Irerralcon <br /> Grand Theatre m 21 Lamar Avenue, Paris, Texas <br /> April 11, 2011 w Terracon Project No. 94107645 <br /> <br /> <br /> CONSULTANT is not responsible for verification of field measurements, construction <br /> criteria, catalog numbers and other similar data. <br /> <br /> Review of separate items does not constitute review of an assembly in which items <br /> function. <br /> <br /> 5.0 CONSTRUCTION NOTES <br /> <br /> <br /> The CONTRACTOR will be responsible for routing water and electricity to the work <br /> areas. Water and electrical service are present on the site at this time. <br /> <br /> Prior to any lead paint abatement activities the CONTRACTOR will provide a licensed <br /> electrician to provide power lock-out and tag-out of all circuits to be affected by the lead <br /> paint abatement activities. Lock-out/Tag-out must meet OSHA 1910.147 requirements. <br /> All electrical circuits in the regulated and/or contained area shall have ground-fault <br /> interrupter (GFCI) units installed. <br /> <br /> Exhaust negative pressure ventilation system to outside of building. <br /> <br /> The CONTRACTOR shall be responsible for installing hard barriers in any window <br /> <br /> openings utilized for exhaust of negative pressure and shall ensure that the building can <br /> be secured between work periods. If necessary, a hard barrier decontamination unit <br /> shall be constructed at the site to ensure building security. <br /> <br /> Toilet facilities are not available on the project site, the CONTRACTOR shall arrange for <br /> temporary self-contained toilet units for use by CONTRACTOR'S personnel throughout <br /> the duration of abatement activities. <br /> <br /> The CONTRACTOR shall install one fire extinguisher in the work area for each 1,000 <br /> square feet of work area or fraction thereof. Additional fire extinguishers shall be <br /> installed in the Equipment Room and Clean Room of the decontamination unit. <br /> <br /> The CONTRACTOR shall conduct a safety meeting for CONTRACTOR'S employees <br /> with emphasis on operation of fire extinguishers and emergency exits in case of fire. <br /> CONTRACTOR shall have posted emergency phone numbers for the fire department <br /> and police. <br /> <br /> <br /> CONTRACTOR shall store a minimum of volatile substances on the job site and in fire <br /> resistant containers only. <br /> <br /> <br /> <br /> v 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.