Laserfiche WebLink
<br /> <br /> <br /> Scope of Work - Lead Paint Abatement Irerralcon <br /> Grand Theatre m 21 Lamar Avenue, Paris, Texas <br /> April 11, 2011 w Terracon Project No. 94107645 <br /> <br /> <br /> CONSULTANT is not responsible for verification of field measurements, construction <br /> criteria, catalog numbers and other similar data. <br /> <br /> Review of separate items does not constitute review of an assembly in which items <br /> function. <br /> <br /> 5.0 CONSTRUCTION NOTES <br /> <br /> <br /> The CONTRACTOR will be responsible for routing water and electricity to the work <br /> areas. Water and electrical service are present on the site at this time. <br /> <br /> Prior to any lead paint abatement activities the CONTRACTOR will provide a licensed <br /> electrician to provide power lock-out and tag-out of all circuits to be affected by the lead <br /> paint abatement activities. Lock-out/Tag-out must meet OSHA 1910.147 requirements. <br /> All electrical circuits in the regulated and/or contained area shall have ground-fault <br /> interrupter (GFCI) units installed. <br /> <br /> Exhaust negative pressure ventilation system to outside of building. <br /> <br /> The CONTRACTOR shall be responsible for installing hard barriers in any window <br /> <br /> openings utilized for exhaust of negative pressure and shall ensure that the building can <br /> be secured between work periods. If necessary, a hard barrier decontamination unit <br /> shall be constructed at the site to ensure building security. <br /> <br /> Toilet facilities are not available on the project site, the CONTRACTOR shall arrange for <br /> temporary self-contained toilet units for use by CONTRACTOR'S personnel throughout <br /> the duration of abatement activities. <br /> <br /> The CONTRACTOR shall install one fire extinguisher in the work area for each 1,000 <br /> square feet of work area or fraction thereof. Additional fire extinguishers shall be <br /> installed in the Equipment Room and Clean Room of the decontamination unit. <br /> <br /> The CONTRACTOR shall conduct a safety meeting for CONTRACTOR'S employees <br /> with emphasis on operation of fire extinguishers and emergency exits in case of fire. <br /> CONTRACTOR shall have posted emergency phone numbers for the fire department <br /> and police. <br /> <br /> <br /> CONTRACTOR shall store a minimum of volatile substances on the job site and in fire <br /> resistant containers only. <br /> <br /> <br /> <br /> v 7 <br />