My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work - Lead Paint Abatement 1rerracon <br /> Grand Theatre c 21 Lamar Avenue, Paris, Texas <br /> April 11, 2011 ® Terracon Project No. 94107645 <br /> <br /> d) Wash all of the surfaces vacuumed in the same sequence previously described. <br /> The Contractor shall utilize a 5-10% tri-sodium phosphate (TSP) detergent solution <br /> or other equally effective cleaning agent and allow the surface to dry. The <br /> Contractor shall clean water rinse all surfaces after washing. <br /> <br /> e) HEPA vacuum all surfaces, as detailed above. <br /> <br /> f) The wastewater from cleaning shall be contained and disposed in accordance <br /> with this work plan. <br /> <br /> Post-abatement or removal to determine if previously specified clearance criteria has <br /> been met in each area of remediation. The clearance level has been established at 40 <br /> micrograms per square foot (µg/ft) on horizontal surfaces. The specific location and <br /> number of samples will be determined upon conclusion of the remediation. If at any time <br /> <br /> the post-abatement or removal wipe samples exceed the clearance levels identified. The <br /> Contractor shall be responsible additional cleaning of the area to attempt to achieve <br /> clearance levels. If additional cleaning is required, the Contractor will perform the re- <br /> cleaning with no adjustment in the contract price. <br /> <br /> PERSONAL MONITORING: <br /> <br /> The CONTRACTOR shall perform air monitoring as required to meet OSHA <br /> requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br /> fiber counts for types of respiratory protection provided. The OWNER will not be <br /> providing air monitoring services to meet these OSHA requirements. Note: Results of <br /> Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br /> samples are obtained. A listing of all personal monitoring results obtained during the <br /> project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br /> submittals. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> ® ® 9 <br /> <br /> <br /> _ 168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.