Laserfiche WebLink
Scope af Work - Asbestos Abatement <br />Grand Thea'tre m 21 Lamar Avenue, Paris, Texas <br />April 14, 2011 m Ten-acon Project No. 94107645 <br />lrerracon <br />q) AIA Contract A-101 2007 wi(I be used ior ihis projeci as the contract with ihe <br />owner. Supplementary Condition to the Standard Form of Agreennent Beiween <br />Owner and CONTRACTOR. <br />3.0 WORK PRACTICES <br />3.1 Respiratory Protection <br />Throughout the project, respirators shail be provided <br />CONTRACTOR will provide respirators which are e <br />purpose intended in accordance with OSHA 1910.13 <br />CONTRACTOR will ensure that the respirators are <br />designed for asbestos-containing dusts and mists <br />accordance with ANSI Z228.2 (1980). <br />3.2 Protective Clothing - <br />by the CONTRACTOR. The <br />Dplicabie and suitable for the <br />I. - Respirator Standard. The <br />equipped with filter cartridges <br />vapors, and color-coded in <br />During removal of the ACM, at least one protective suit will be worn by each worker. <br />Boots and gloves will be made available to each worker as needed. All protective suits <br />will be properly disposed of at the conclusion of the work. The workers performing the <br />abatement will decontaminate thoroughly in three-chambered wet decontamination <br />system attached to each containment. <br />3.3 Containment <br />The asbestos containing materials will be abated in a series of full containments <br />constructed of two (2) layers of 4-mil polyethylene sheeting on the walls and two (2) <br />layers of 6-mil polyethylene sheeting on the floors (where applicable), and one layer of <br />4-mil polyethylene sheeting on the ceiling, in conjunction with critical barriers, negative <br />pressure, and a three chambered wet decontamination system. <br />Decontamination System: disposable/pop-up units displaying excessive use or <br />wear will not be permitted for the decontamination system. Provide a Personnel <br />Decontamination Unit consisting of a serial arrangement of connected rooms or spaces, <br />Changing Room, Shower Room, and Equipment Room. Require all persons without <br />exception to pass through this decontamination unit for entry into and exiting from the <br />work area for any purpose. Do not allow parallel routes for entry or exit. <br />Chanqinq Room (clean room): Provide a room that is physically and visualiy sepa ted <br />from the rest of the building for the purpose of changing into protective c thing. <br />Consiruct using polyeihylene sheeiing, ai leasi G-mil in ihicknc-ss, to provide ~ airighi <br />seal f~erwee~~ fl7e Chanoing f'ooi~~~ ai7d ihe resi oi if~~e f~uifo'ii~g. Locate~~ ha` accc-ss 10 <br />