My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatre 8 21 Lamar Avenue, Paris, Texas <br />April 14, 2011 ■ Terracon Project No. 94107645 <br />7.0 AIR MONITORING SERVICES <br />The responsibility for petforming visual inspECiions and air monitoring sarvices is <br />delegated to Terracon's on-site State of i exas ficensed project manager/air moniforing <br />technician. <br />The CONSULTANT shall verify that the Work performed is in compliance with applicable <br />regulations and that the building areas beyond the Work Area and the outside <br />environment remain free of contamination. This section also sets forth airborne fiber <br />levels both inside and outside the Work Area as permissible exposure limits (PELs), and <br />describes the action required by the CONTRACTOR if a permissible exposure limit is <br />met or exceeded. <br />AIR MONITORING: <br />The CONSULTANT will be conducting air monitoring throughout the course of the <br />project. <br />Work Area Isolation: The CONSULTANT will monitor airborne fiber counts outside the <br />Work Area. The purpose of this air monitoring will be to detect faults in the Work Area <br />isolation including, but not limited to, contamination of the building outside of the Work <br />Area with airborne asbestos fibers, failure of filtration or rupture in the ventilation system, <br />or contamination of the exterior of the building with airborne asbestos fibers. <br />Shouid any of the above occur, the CONTRACTOR shall immediately cease asbestos <br />abatement activities until the fault is corrected. Work shall not recommence until <br />authorized by the CONSULTANT. <br />Work Area Airborne Fiber Count: The CONSULTANT will monitor airborne fiber counts <br />in the Work Area. The purpose of this air monitoring will be to detect airborne fiber <br />counts which may significantly challenge the integrity of Work Area isolation procedures <br />that protect the balance of the building or outside of the building from contamination by <br />airborne fibers. <br />AIRBORNE FIBER COUNTS: <br />Inside Work Area: Maintain an average airborne count in the Work Area of less than 0.1 <br />fibers per cubic centimeter. if the fiber counts rise above this figure for any sample <br />taken, revise work procedures to lower fiber counts. If the Time Weighted Average <br />(TWA) fiber count for any Work shift or eight (8) hour period exceeds 0.1 fibers per cubic <br />~nce <br />centimeter, stop work and leave ventilation system in operatian. Do n 7~/ <br />~NOrk until au'tl~orized by the GQNSULTANT. - - ~ u- <br />~ ■ _ ~ ~ ~ ~ ~ <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.