My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatre m 21 Lamar Avenue, Paris, Texas <br />April 14, 2011 e Terracon Projeci No. 94107645 <br />Outside Work Area: Maintain an average airborne count outside ihe Work Area below <br />the Permissible Exposure Limit (PEL) oi 0.1 f/cc oi air. <br />If any air sample taken autside ihe Work Area exceeds the PEL, irnmediately stop work <br />until the source of the elevated fiber readings can be determined by the CORISULTANT. <br />Immediately take carrective as instructed by the CONSULTANT. <br />Decontaminate the affected area in accordance industry standard methods. <br />ANALYTICAL METHODS: <br />The following methods will be utilized at the discretion of the CONSULTANT in collecting <br />and analyzing air samples: <br />Phase Contrast Microscopy (NIOSH 7400 Method, Issue 2, Revision 3 or OSHA <br />Reference Method) <br />Transmission Electron Microscopy (40 CFR Part 763, Subpart E, Appendix A) <br />SAMPLE PROTOCOLS: <br />General: The number and volume of air samples taken by the CONSULTANT will <br />generally be in accordance with the following schedule. Sample quantities, locations, <br />volumes and methodologies may vary depending upon the analyticai method, project <br />layout, procedures used and at the discretion of the CONSULTANT. <br />SCHEDULE OF AIR SAMPLES FOR CONTAINMENT(S): <br />Dailv Sample Schedule (per 8-hour work period): The CONSULTANT will generally take <br />the foilowing samples on a daily (8-hour work period) basis. The number of samples <br />may vary according to site plan and on authorization of CONSULTANT. <br />Base Line Sample Schedule: The CONSULTANT will secure the following air samples <br />to establish a Base Line before start of Work. The number of samples may vary <br />according to site plan and on authorization of CONSULTANT. <br />on Sampled <br />Minimum Number <br />of Samples <br />Minimum Sample <br />Volume <br />Planned Analytical <br />Method <br />Work Ar ea <br />[EEEaachh <br />3 <br />1,250 Liters <br />PCM <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.