Laserfiche WebLink
Scope of Work - Asbestos Abatement Irerracon <br />Grand I heatre o 21 Lai~~ar Avenue, Paris, Texas <br />April 14, 2011 ■ I erracon Project No. 94107645 <br />Daily Sample Schedule (per 8-hour work period): The CONSULTANT will generally iaE:e <br />'Lhe following samples on a daily (8-houi- work period) basis. The number of samples <br />inay vary according to site plan and on authorizaiion of CONSULTANT. <br />Location Sampled <br />Minimum Number <br />Minimum Sample <br />Pianned Analytical <br />of Samples <br />Volume <br />Method <br />Each Work Area <br />1 <br />500 Liters <br />PCM <br />Outside Each Work <br />1 <br />500 Liters <br />PCM <br />Area/Inside Building <br />Decon Unit Clean <br />~ <br />500 Liters <br />PCM <br />Room <br />Output of Negative <br />Pressure Ventilation <br />1 <br />500 Liters <br />PCM <br />System <br />Clearance Sample Schedule: The CONSULI AN I wili secure tne rouowing air sampies <br />to determine air clearance at the conclusion of abatement. The number of samples may <br />vary according to site plan and on authorization of CONSULTANT. <br />Location Sampled <br />Minimum Number <br />of Samples <br />Minimum Sample <br />Volume <br />Planned Analytical <br />Method <br />Each Work Area <br />3 <br />1,250 Liters <br />PCM <br />If airborne fiber counts exceed baseline limits, additional samples wiil be taken (and <br />classified as retests) as necessary to monitor fiber levels and confirm sources. <br />The CONSULTANT, in addition to providing air monitoring services, will provide full- <br />time, on-site inspection of work activities. Work shali not proceed without prior notice to <br />the CONSULTANT and presence of the CONSULTANT on the work site (requires 48 <br />hours advance notice of work). <br />The CONSULTANT will conduct the following key Project inspections and no work by <br />the CONTRACTOR will proceed beyond these points until all discrepancies noted during <br />the inspection have been corrected. <br />The CONSULTANT'S inspections do not relieve the CONTRACTOR of Contract <br />obligations and are not designed to locate all project discrepancies. The <br />CONTRACTOR is responsib{e fior project quality. <br />