My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Asbestas Abatement lrerrocon <br />Grand Theaire m 21 Lamar Avenue, Paris, Texas <br />April 14, 2011 io Terracon Project No. 94107645 <br />First Key Inspection: <br />Inspection of Work Area Prior to Start of Removaf: Removal operatioris shalf not <br />proceed until the CONSULTANT has completed fllSpeCtfOfl oi The Work Area <br />preparations and until all discrepancies noted have been corrected. <br />Second Key Inspection: <br />Inspection Durinq Removal: Removal Work shall not be conducted unless the <br />CONSULTANT is on the Project site. Daily inspection of the Work Area and Work <br />practices will be conducted; upon discovery and report of a discrepancy the <br />CONTRACTOR shall immediately stop Work and correct the discrepancy. <br />Third Key Inspection: <br />Inspection of Work Area After Completion of Removal Work, but Prior to Encapsulation <br />and Containment Disassembly: A visual inspection of the Work site and/or Containment <br />areas and removal surfaces will be conducted at this point by the CONSULTANT and <br />encapsulation and/or containment disassembly shall not proceed until discrepancies <br />noted have been corrected. <br />Fourth Key Inspection: <br />Final Clearance: After encapsulation and final clean-up of the Work Area, but prior to <br />removal of Critical Barriers, the CONSULTANT will conduct a visual inspection. <br />Final Key Inspection: <br />Proiect Closeout Inspection: A final inspection will be conducted by the CONSULTANT <br />after the CONTRACTOR has removed all barrier tape, drop-cloths, equipment, and <br />supplies. A project "Punch List" will be provided of any items requiring correction or <br />completion. Punch List items shall be completed prior to issuance of final completion <br />notice by the CONTRACTOR. <br />Discrepancies or needed corrective measures observed by the CONSULTANT will be <br />reported to the CONTRACTOR'S Superintendent on-site and shall be immediately <br />corrected. <br />The above inspections are not necessarily single events. Failed inspections will be re- <br />conducted and iime classified as retests and charged bac!< to the CORITRACTOR in <br />accordance with the project documents. lnspections wifl require 24 hours advanc~ <br />notice io the GONSULTANi. r/~ f~ <br />■ ~ _ i F, <br />
The URL can be used to link to this page
Your browser does not support the video tag.