My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Asbestos Abatement Irerracon <br />Grand Theafre ■ 21 Lamar Avenue, Paris, Texas <br />April 14, 2011 m Terracon Project No. 94107645 <br />PERSONAL MONITORING: <br />I he GONTRACTOR shall perfon-n air monitoring as required zo i-neet OSHA <br />requirements ior mainfieiiance ofi Time Weighted Average (TWA) and excursiofl limit <br />fiber counts for types of respiratory protection provided. The OWNER wiil not be <br />providing air monitoring seivices to meet ihese OSHA requirements. Nofe: Results af <br />Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br />samples are obtained. A listing of ali personal monitoring results obtained during the <br />project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br />submittals. <br />LABORATORY TESTING: <br />The CONSULTANT will perform field analysis of the air samples. A microscope and <br />field laboratory will be set up at the jobsite, at the option of the CONSULTANT, so that <br />verbal reports on air samples can be obtained promptly after coilection. <br />Reports to the OWNER by the CONSULTANT will include air monitoring data and <br />pertinent information on work being conducted such as: work hours, number of workers, <br />procedures used, CONTRACTOR discrepancies and corrective measures, containment <br />methods and construction, and amount of ACM removed. <br />o ■ - - _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.