Laserfiche WebLink
Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre c 21 Lamar Avenue, Paris, Texas <br />April 11, 2011 a Terracon Project No. 94107645 <br />d) Wash all of the surfaces vacuumed in the same sequence previously described. <br />The Contractor shall utilize a 5-10% tri-sodium phosphate (TSP) detergent solution <br />or other equally effective cleaning agent and allow the surface to dry. The <br />Contractor shall ciean water rinse all surfaces after washing. <br />e) HEPA vacuum ail surfaces, as detailed above. <br />fl The wastewater from cleaning shall be contained and disposed in accordance <br />with this work plan. <br />Post-abatement or removal to determine if previously specified clearance criteria has <br />been met in each area of remediation. The clearance level has been established at 40 <br />micrograms per square foot (µg/ft) on horizontal surfaces. The specific location and <br />number of samples will be determined upon conclusion of the remediation. If at any time <br />the post-abatement or removal wipe samples exceed the clearance levels identified. The <br />Contractor shall be responsible additional cleaning of the area to attempt to achieve <br />clearance levels. If additional cleaning is required, the Contractor will perform the re- <br />cleaning with no adjustment in the contract price. <br />PERSONAL MONITORING: <br />The CONTRACTOR shall perform air monitoring as required to meet OSHA <br />requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br />fiber counts for types of respiratory protection provided. The OWNER will not be <br />providing air monitoring services to meet these OSHA requirements. Note: Results of <br />Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br />samples are obtained. A listing of all personai monitoring results obtained during the <br />project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br />submittals. <br />0 0 9 <br />