My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-043 RES AWARDING A CONTRACT TO TOTAL ABATEMENT SYSTEMS CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:03:18 AM
Creation date
5/20/2011 11:52:28 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2011-043
Doc Type
Resolution
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work - Lead Paint Abatement Irerracon <br />Grand Theatre c 21 Lamar Avenue, Paris, Texas <br />April 11, 2011 a Terracon Project No. 94107645 <br />d) Wash all of the surfaces vacuumed in the same sequence previously described. <br />The Contractor shall utilize a 5-10% tri-sodium phosphate (TSP) detergent solution <br />or other equally effective cleaning agent and allow the surface to dry. The <br />Contractor shall ciean water rinse all surfaces after washing. <br />e) HEPA vacuum ail surfaces, as detailed above. <br />fl The wastewater from cleaning shall be contained and disposed in accordance <br />with this work plan. <br />Post-abatement or removal to determine if previously specified clearance criteria has <br />been met in each area of remediation. The clearance level has been established at 40 <br />micrograms per square foot (µg/ft) on horizontal surfaces. The specific location and <br />number of samples will be determined upon conclusion of the remediation. If at any time <br />the post-abatement or removal wipe samples exceed the clearance levels identified. The <br />Contractor shall be responsible additional cleaning of the area to attempt to achieve <br />clearance levels. If additional cleaning is required, the Contractor will perform the re- <br />cleaning with no adjustment in the contract price. <br />PERSONAL MONITORING: <br />The CONTRACTOR shall perform air monitoring as required to meet OSHA <br />requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br />fiber counts for types of respiratory protection provided. The OWNER will not be <br />providing air monitoring services to meet these OSHA requirements. Note: Results of <br />Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br />samples are obtained. A listing of all personai monitoring results obtained during the <br />project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br />submittals. <br />0 0 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.