My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-070 RES AWARDING A CONTRACT TO 911 RESTORATION INC FOR GRAND THEATER HAZARDOUS REMEDIATION
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-070 RES AWARDING A CONTRACT TO 911 RESTORATION INC FOR GRAND THEATER HAZARDOUS REMEDIATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:06:06 AM
Creation date
8/30/2011 12:33:09 PM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. File and obtain local and state demolition permits and notices. <br />2.3 Examination <br />2.4 <br />2.5 <br />A. CONTRACTOR shall survey the existing conditions prior to beginning on-site <br />demolition operations. <br />B. Verify that existing utilities to be removed have been disconnected and capped. <br />C. If unanticipated mechanical, electrical, or structural elements that conflict with the <br />intended function or design of the site are encountered, investigate and measure <br />the nature and extent of the conflict. <br />Utility Services <br />A. Maintain existing utilities in service and protect against damage during demolition <br />operations. <br />B. Schedule any utility outages with the Director of Engineering, Planning and <br />Development prior to disconnection. <br />Protection <br />A. CONTRACTOR shall be responsible for the safety of personnel and operations. <br />CONTRACTOR shall provide appropriate safety warnings for the protection of <br />the work area. Provision of safety includes use of appropriate barricades, traffic <br />control, control of the use of equipment near traffic or pedestrians, and provision <br />of other controls and warnings as needed or as specified herein. <br />B. CONTRACTOR shall continuously maintain adequate protection of all adjacent <br />construction against damage or loss from the operations performed under this <br />section. CONTRACTOR shall make good any such damage, injury, or loss, <br />except such as may be directly due to the actions of the CITY or its agents or due <br />to causes beyond CONTRACTOR's control and not to his fault or negligence. <br />C. All demolition that involves the removal or disturbance of asbestos containing <br />materials shall be performed in accordance with all applicable State and Federal <br />codes and regulations. <br />D. Equipment and tools left on the property are the responsibility of <br />CONTRACTOR. CITY shall not be responsible for theft, damage, or adverse use <br />of the equipment. <br />2.6 Sequencing/Scheduling <br />A. CONTRACTOR shall work with the CITY and the Director of Engineering, <br />Planning and Development to sequence and schedule work as necessary to obtain <br />substantial completion in accordance with the project schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.