My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-070 RES AWARDING A CONTRACT TO 911 RESTORATION INC FOR GRAND THEATER HAZARDOUS REMEDIATION
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-070 RES AWARDING A CONTRACT TO 911 RESTORATION INC FOR GRAND THEATER HAZARDOUS REMEDIATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:06:06 AM
Creation date
8/30/2011 12:33:09 PM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Proper coordination for the shut-off of utility services and control measures for <br />dust and noise must occur prior to commencement of any demolition work. <br />3 EXECUTION <br />3.1 Preparation <br />A. Verify termination of utilities prior to commencing demolition activities on any <br />structure. <br />B. Coordinate maintenance of power, water, or other utilities necessary for any <br />adjacent building operations. <br />3.2 Remediation <br />A. Perform remediation in a manner to prevent injury or damage to persons, property, <br />and adjacent roadways and structures and take care not to weaken or otherwise <br />damage structural integrity of any work to remain. <br />B. Sprinkle asbestos affected debris with water to lay dust daily, but not to the extent <br />of creating flooding. <br />C. Remove designated structures in their entirety to the slab. <br />D. Fill any voids or ruts caused by CONTRACTOR in the act of performing the Work <br />with soil and evenly compact to density of adjacent soil. <br />E. Salvage, protect, and relocate any structures or materials designated for <br />preservation by Owner. <br />F. Overall safety and adverse impact to the neighborhood shall be considered a <br />priority. CONTRACTOR shall provide remediation within hours which are <br />reasonable to the conditions of the neighborhood. <br />G. CONTRACTOR shall not leave the work site when portions of a structure or other <br />iteins are in a dangerous condition. Such conditions may require posting a guard <br />or continuing the demolition until the condition is relieved. <br />H. Mature and protected trees found on a property shall be protected. <br />CONTRACTOR shall work around the tree carefully to prevent damage to the tree <br />and its root system. Sapling trees and sprouts may be removed only if they are <br />found in a path needed for access to the structures. <br />3.3 Adjustment and Cleaning <br />A. Remove debris on a daily basis. <br />B. Do not store or burn materials on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.