Final Report
<br />City of Paris, Tezas
<br />Wastewater Collection System Capacity Analysis
<br />Table 2- Replacement Line Segments (Continued from previous page)
<br />Avg.
<br />Exist.
<br />No Rehab
<br />No Rehab
<br />Top 5
<br />Top 5
<br />Top 10
<br />Top 1 O
<br />Rehab All
<br />Rehab All
<br />BASIN
<br />Segment
<br />Depth
<br />Length
<br />Dia.
<br />Dia.
<br />Est. Cost
<br />Dia.
<br />Est. Cost
<br />Dia.
<br />Est. Cost
<br />Dia.
<br />Est. Cost
<br />PR29
<br />26-0007M 29-0045M
<br />10
<br />353
<br />18
<br />24
<br />$49,773
<br />24
<br />$49,773
<br />24
<br />$49,773
<br />PR29
<br />29-0010M 29-0005M
<br />8
<br />463
<br />18
<br />30
<br />$61,579
<br />27
<br />$61,579
<br />27
<br />$61,579
<br />24
<br />$56,486
<br />PR29
<br />29-0015M_29-0010M
<br />6
<br />311
<br />18
<br />30
<br />$37,631
<br />27
<br />$37,631
<br />27
<br />$37,631
<br />24
<br />$32,033
<br />PR29
<br />29-0020M_29-0015M
<br />6
<br />110
<br />18
<br />30
<br />$13,310
<br />27
<br />$13,310
<br />27
<br />$13,310
<br />24
<br />$11,330
<br />PR29
<br />29-0025M_29-0020M
<br />5
<br />435
<br />15
<br />30
<br />$52,635
<br />27
<br />$52,635
<br />24
<br />$44,805
<br />24
<br />$44,805
<br />PR29
<br />29-0040M 29-0035P
<br />14
<br />10
<br />18
<br />30
<br />$2,050
<br />27
<br />$2,050
<br />27
<br />$2,050
<br />24
<br />$1,790
<br />PR29
<br />29-0045M_29-0040M
<br />11
<br />264
<br />18
<br />24
<br />$39,864
<br />24
<br />$39,864
<br />24
<br />$39,864
<br />PR29
<br />29-0070M 29-0040M
<br />9
<br />553
<br />10
<br />18
<br />$65,807
<br />PR29
<br />29-0075M_29-0070M
<br />7
<br />490
<br />10
<br />18
<br />$49,980
<br />PR29
<br />29-OOSOM 29-0075M
<br />9
<br />427
<br />10
<br />18
<br />$50,813
<br />PR29
<br />29-0085M 29-0080M
<br />10
<br />302
<br />10
<br />18
<br />$38,656
<br />PR29
<br />29-0090M 29-0085M
<br />11
<br />514
<br />10
<br />18
<br />$70,418
<br />PR29
<br />29-0095M_29-0090M
<br />11
<br />859
<br />8
<br />15
<br />$111,670
<br />PR29
<br />29-0100M 29-0095M
<br />8
<br />295
<br />8
<br />15
<br />$37,270
<br />PR29
<br />29-0110M_29-0100M
<br />10
<br />103
<br />8
<br />15
<br />$12,566
<br />PR29
<br />29-0115M_29-0110M
<br />10
<br />400
<br />6
<br />15
<br />$48,800
<br />PR29
<br />29-0120M_29-0115M
<br />9
<br />234
<br />6
<br />15
<br />$26,676
<br />PR29
<br />29-0130M_29-0120M
<br />8
<br />188
<br />6
<br />12
<br />$17,484
<br />PR29
<br />29-0150M_29-0145P
<br />10
<br />16
<br />6
<br />12
<br />$1,664
<br />PR29
<br />29-0155M_29-0150M
<br />11
<br />307
<br />6
<br />12
<br />$33,770
<br />PR29
<br />Subtotat
<br />$816,416
<br />$256,842
<br />$249,012
<br />$146,444
<br />PR30
<br />20-0005M_30-0030M
<br />14
<br />388
<br />27
<br />54
<br />$150,544
<br />45
<br />$102,044
<br />45
<br />$102,044
<br />39
<br />$95,060
<br />PR30
<br />30-0010M_30-0005M
<br />8
<br />1590
<br />27
<br />36
<br />$222,600
<br />33
<br />$222,600
<br />33
<br />$222,600
<br />PR30
<br />30-0025M_30-0020M
<br />9
<br />960
<br />27
<br />33
<br />$145,920
<br />PR30
<br />30-0050M 30-0045M
<br />8
<br />635
<br />8
<br />15
<br />$67,310
<br />PR30
<br />30-0055M_30-0050M
<br />8
<br />573
<br />8
<br />15
<br />$60,738
<br />PR30
<br />30-0075M_30-0070M
<br />9
<br />398
<br />8
<br />15
<br />$45,372
<br />PR30
<br />Subtotal
<br />$692,484
<br />$324,644
<br />$324,644
<br />595,060
<br />Est. Rep
<br />lacement Total
<br />=7,480,442
<br />$6,026,298
<br />$4,510,030
<br />$1,971,758
<br />Est. Rehabilitation Total
<br />$O
<br />$899,551
<br />$2,490,106
<br />$8,252,372
<br />Est. Program Total
<br />$7,480,442
<br />$6,925,849
<br />$7,000,136
<br />=10,224,130
<br />No Rehab
<br />Top 5
<br />Top 10
<br />Rehab All
<br />19
<br />
|