Laserfiche WebLink
Final Report <br />City of Paris, Tezas <br />Wastewater Collection System Capacity Analysis <br />Table 2- Replacement Line Segments (Continued from previous page) <br />Avg. <br />Exist. <br />No Rehab <br />No Rehab <br />Top 5 <br />Top 5 <br />Top 10 <br />Top 1 O <br />Rehab All <br />Rehab All <br />BASIN <br />Segment <br />Depth <br />Length <br />Dia. <br />Dia. <br />Est. Cost <br />Dia. <br />Est. Cost <br />Dia. <br />Est. Cost <br />Dia. <br />Est. Cost <br />PR29 <br />26-0007M 29-0045M <br />10 <br />353 <br />18 <br />24 <br />$49,773 <br />24 <br />$49,773 <br />24 <br />$49,773 <br />PR29 <br />29-0010M 29-0005M <br />8 <br />463 <br />18 <br />30 <br />$61,579 <br />27 <br />$61,579 <br />27 <br />$61,579 <br />24 <br />$56,486 <br />PR29 <br />29-0015M_29-0010M <br />6 <br />311 <br />18 <br />30 <br />$37,631 <br />27 <br />$37,631 <br />27 <br />$37,631 <br />24 <br />$32,033 <br />PR29 <br />29-0020M_29-0015M <br />6 <br />110 <br />18 <br />30 <br />$13,310 <br />27 <br />$13,310 <br />27 <br />$13,310 <br />24 <br />$11,330 <br />PR29 <br />29-0025M_29-0020M <br />5 <br />435 <br />15 <br />30 <br />$52,635 <br />27 <br />$52,635 <br />24 <br />$44,805 <br />24 <br />$44,805 <br />PR29 <br />29-0040M 29-0035P <br />14 <br />10 <br />18 <br />30 <br />$2,050 <br />27 <br />$2,050 <br />27 <br />$2,050 <br />24 <br />$1,790 <br />PR29 <br />29-0045M_29-0040M <br />11 <br />264 <br />18 <br />24 <br />$39,864 <br />24 <br />$39,864 <br />24 <br />$39,864 <br />PR29 <br />29-0070M 29-0040M <br />9 <br />553 <br />10 <br />18 <br />$65,807 <br />PR29 <br />29-0075M_29-0070M <br />7 <br />490 <br />10 <br />18 <br />$49,980 <br />PR29 <br />29-OOSOM 29-0075M <br />9 <br />427 <br />10 <br />18 <br />$50,813 <br />PR29 <br />29-0085M 29-0080M <br />10 <br />302 <br />10 <br />18 <br />$38,656 <br />PR29 <br />29-0090M 29-0085M <br />11 <br />514 <br />10 <br />18 <br />$70,418 <br />PR29 <br />29-0095M_29-0090M <br />11 <br />859 <br />8 <br />15 <br />$111,670 <br />PR29 <br />29-0100M 29-0095M <br />8 <br />295 <br />8 <br />15 <br />$37,270 <br />PR29 <br />29-0110M_29-0100M <br />10 <br />103 <br />8 <br />15 <br />$12,566 <br />PR29 <br />29-0115M_29-0110M <br />10 <br />400 <br />6 <br />15 <br />$48,800 <br />PR29 <br />29-0120M_29-0115M <br />9 <br />234 <br />6 <br />15 <br />$26,676 <br />PR29 <br />29-0130M_29-0120M <br />8 <br />188 <br />6 <br />12 <br />$17,484 <br />PR29 <br />29-0150M_29-0145P <br />10 <br />16 <br />6 <br />12 <br />$1,664 <br />PR29 <br />29-0155M_29-0150M <br />11 <br />307 <br />6 <br />12 <br />$33,770 <br />PR29 <br />Subtotat <br />$816,416 <br />$256,842 <br />$249,012 <br />$146,444 <br />PR30 <br />20-0005M_30-0030M <br />14 <br />388 <br />27 <br />54 <br />$150,544 <br />45 <br />$102,044 <br />45 <br />$102,044 <br />39 <br />$95,060 <br />PR30 <br />30-0010M_30-0005M <br />8 <br />1590 <br />27 <br />36 <br />$222,600 <br />33 <br />$222,600 <br />33 <br />$222,600 <br />PR30 <br />30-0025M_30-0020M <br />9 <br />960 <br />27 <br />33 <br />$145,920 <br />PR30 <br />30-0050M 30-0045M <br />8 <br />635 <br />8 <br />15 <br />$67,310 <br />PR30 <br />30-0055M_30-0050M <br />8 <br />573 <br />8 <br />15 <br />$60,738 <br />PR30 <br />30-0075M_30-0070M <br />9 <br />398 <br />8 <br />15 <br />$45,372 <br />PR30 <br />Subtotal <br />$692,484 <br />$324,644 <br />$324,644 <br />595,060 <br />Est. Rep <br />lacement Total <br />=7,480,442 <br />$6,026,298 <br />$4,510,030 <br />$1,971,758 <br />Est. Rehabilitation Total <br />$O <br />$899,551 <br />$2,490,106 <br />$8,252,372 <br />Est. Program Total <br />$7,480,442 <br />$6,925,849 <br />$7,000,136 <br />=10,224,130 <br />No Rehab <br />Top 5 <br />Top 10 <br />Rehab All <br />19 <br />