Laserfiche WebLink
I. EXECUTIVE SUMMARY AND RECOMMENDED PLAN <br />A. Overview <br />The primary purpose of the Sanitary Sewer Evaluation Survey was to identify <br />areas of excessive inflow and infiltration into the City of Paris wastewater <br />collection system. This report will present all findings from the SSES of the <br />system, along with recommendations for rehabilitation of defects and sub- <br />standard appurtenances. B. Summary of Findings <br />1. Field Inspection <br />Approximately 7,000 defects were located through physical inspection, <br />smoke testing, dyed water testing, and television inspection. <br />Rehabilitation of public sector defects is estimated to cost approximately <br />$8,000,000, and 53% of this cost is associated with mainline point repairs, <br />lining, and replacement. As part of the field inspection activities, all <br />structures were numbered. <br />2. Capacity Analysis <br />Results of the hydraulic model will be presented in Appendix A. <br />3. Lift Station Pump Performance <br />Results of the 41ift station pump performance tests will be presented in a <br />separate letter report. <br />C. Conclusions <br />The following aze the conclusions reached by ADS based on all collected data and <br />available information: <br />ADS Environmental Services, Inc. <br />I-1 <br />