Laserfiche WebLink
Minutes of the PEDC Regular meeting <br />July 21, 2004 <br />Page2 <br />President Wall asked Gene Anderson, Director of Finance, for the City of Paris <br />to come forward and give the financial report for June 2004. <br />Mr. Anderson advised the Board had been furnished the sales tax update. They <br />had collections of $73,826.17 for the month of July and compared to the <br />previous year, the tax was down by $2,500.00. He said that for the year the <br />sales tax is up by $8,864.00 compared to the same time last year. <br />Mr. Anderson said they were furnished with a statement of the cash, and in <br />keeping with his usual presentation by exception, there were no unusual items <br />in the expenditures this month. He said if they had any questions he would <br />answer those. <br />A motion was made by Director Norment, seconded by Director Severson for <br />approval of the financial report. The motion carried unanimously. <br />President Wall called for the Director's report. <br />Gary Vest reported that the Industrial Park and the Hearn Street Project were <br />back underway, because after all of the rain, they were unable to work, but <br />they are now back in full force on the Hearn Street. He said that should be <br />wrapped up pretty soon. Mr. Vest advised that there has been a lot of progress <br />done to the Industrial Park. Mr. Vest said they were doing work with TXU <br />Gas, as they are doing the engineering to bring the gas to the Industrial Park <br />and they gave PEDC the engineering drawings and they will be putting it out <br />for bids. He said on the electrical drawings after they did all the engineering, <br />they are going to come across with the electricity and bring it in there at Jerry <br />Pitcock's, where they cross with the water and they are going to bring the <br />electricity under the freeway there. The cost will be approximately $50.000.00 <br />to get the electricity in and to C-Tech. Mr. Vest said that TXU is going to do <br />the work and the PEDC is going to pay them for doing the work because they <br />are already doing most of the work by bringing it under the freeway. He <br />advised that they would go out for bids on the gas when they get the drawing. <br />