Laserfiche WebLink
Labor to install (1) each exterior door, cioser and hardware <br />$ <br />235.00 <br />Labor and material to install 12"X12" VCT floor to match existing in the <br />5'X23' hall, repair the floor were the walis will be taken out (will not be <br />full tile) and install new base. The run # will be different, so the color <br />may not match pertect. <br />$ <br />709.50 <br />Daily cfean up <br />$ <br />125.00 <br />Final dean up <br />$ <br />75.00 <br />Landfill and dumpster fees <br />$ <br />224.00 <br />Sub total <br />$ <br />25,365.46 <br />General conditions <br />$ <br />2,536.55 <br />Sub total <br />$ <br />27,902.01 <br />Contractor fee <br />$ <br />2,790.20 <br />Sub total <br />$ <br />30,692.21 <br />Sales tax (N/A) <br />$ <br />- <br />Total <br />$ <br />30,692.21 <br />Thank you, <br />Bobby Smallwood <br />cc: Chief Ronnie Grooms <br />p J <br />