My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
11 November
>
11/14/11
>
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 4:14:14 PM
Creation date
11/10/2011 2:36:48 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />r <br />BOBBY SMALLWOOD CONSTRUCTION CO., INC. <br />1795 NE 17th STREET <br />Paris, Texas 75460 <br />Phone: 903-739-2350 Email: bgsmallwood@sbcglobal.net Fax: 903-739-2795 <br />ESTIMATE <br />3-May-11 <br />City of Paris <br />135 SE 1 st Street <br />Paris, Texas 75460 <br />Attention: Chief Ronnie Grooms <br />Phone: 903-784-4670 E-mail rgrooms@paristexas.gov <br />RE: Exit hall and stairs for Fire Station # 1 <br />City of Paris will payfor building permit <br />City of Paris will pay for Asbestos survey <br />If Asbestos is found, The City of Paris will pay for abetment. <br />Tear out (2) each 5' openings in (2) walls and demo 1 each 12'X12' <br />room. <br />$ 242.00 <br />Frame 43' lineal ft of wall with openings for (2) 3'X7' doors. The hall will <br />have a offset in it to miss the existing radio tower on the South end of <br />building. <br />$ 430.00 <br />Install 31/2" insulation in the wall and 5/8" fire code drywall on both <br />sides of new wall. <br />$ 660.00 <br />Cut wall and frame opening for exterior door in the South wall <br />$ 120.00 <br />Remove the brick from the door opening, salvage and reuse in setting <br />welded door frame <br />$ 650.00 <br />Cut 20' ceiling grid in the center room, install wall angle and rework the <br />existing grid and ceiling tile <br />$ 110.00 <br />Install ceiling grid, insulation and tile in 5'X23' hall <br />$ 488.75 <br />Labor and material to install fire/smoke alarms and connect to existing <br />system <br />$ 982.91 <br />Labor and material to install electrical switches, receptacles, fixtures <br />and (1) each exit light with emergency lighting. As required in thin wall <br />conduit <br />$ 880.00 <br />Labor and material to connect to existing fire sprinkler system and <br />install sprinkler heads as required by code <br />$ 1,976.00 <br />Labor and material to move and rebuild the chase for HVAC from the <br />second floor to the first floor <br />$ 365.00 <br />Labor and materiat to tape, bed, texture and paint <br />$ 1,457.00 <br />Labor and material to build and install (1) sef of steel exterior stairs <br />with concrete treads. The existing roof cover over the first floor door <br />will be relocated under the stairs. <br />$ 12,169.00 <br />Labor and material pour a concrete pad under the door landing and <br />4'X10' conErete pad at the bottom of the stairs <br />$ 660.00 <br />(4) each 1 hour fire rated Timley door frames, (4) each 20 fire rated <br />Red Oak doors, (4) each closers, (4) each Corbin Russwin lock sets <br />and (12) each HD 41/2" hinges. <br />$ 1,630.30 <br />Labor to install (4) each door frames, doors, closers and hardware <br />$ 400.00 <br />(1) 3'X7' welded exterior door frame, (1) each 3'X7' hollow metal <br />exterior door, (1) each view glass and frame, (1) each door closer <br />$ 776.00 <br />-11 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.