Laserfiche WebLink
Labor to install (1) each exterior door, closer and hardware <br />Labor and material to install 12"X12" VCT floor to match existing in the <br />5'X23' hall, repair the floor were the walls will be taken out (will not be <br />full tile) and install new base. The run # w+ll be different, so the color <br />may not match perFect. <br />Daily clean up <br />Final clean up <br />Landfill and dumpster fees <br />Sub total <br />General conditions <br />Sub total <br />Contractor fee <br />Sub total <br />Sales tax (N/A) <br />Total <br />Thank you, <br />Bobby Smallwood <br />cc: Chief Ronnie Grooms <br />$ 235.00 <br />$ <br />709.50 <br />$ <br />125.00 <br />$ <br />75.00 <br />$ <br />224.00 <br />$ 25,365.46 <br />$ 2,536.55 <br />$ 27,902.01 <br />$ 2,790.20 <br />$ 30,692.21 <br />$ <br />- <br />692.21 <br />$ 0, <br />. 87 <br />