My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
11 November
>
11/14/11
>
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 4:14:14 PM
Creation date
11/10/2011 2:36:48 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />° <br />4 November 2011 <br />Fire Chief Ronnie Grooms <br />City of Paris Fire Department <br />1444 N. Main St <br />Paris, Texas 75460 <br />Reference: Fire Station 1 2"d Floor Corridor expansion <br />Fire Chief Grooms, <br />Thank you for the opportunity to present you with this proposal. Our pricing is based on <br />the following scope of work: <br />Includes Materials, Labor and Supervision to perform the following: <br />• 2nd Floor Demo to accommodate new construction <br />o Demo existing walls at Conference room approx 5' <br />o Acoustical ceiling grid and tile approx 5' into Conference Room <br />o Existing storage room at South end next to exterior wall <br />o Demo existing air duct chase in main storage area <br />• New wall construction <br />o Frame and drywall approx 44' <br />o New air duct chase <br />o(1) 3-0 x 6-8 hollow core door to Conference room with passage lock <br />o(1) 3-0 x 6-8 insulated residential steel insulated door to storage area with <br />passage lock <br />• South 2"d Floor Egress <br />o Remove brick from exterior of building at new door location and install sill <br />flashing and brick steel lintel <br />o new 3 x 7 holtow metal door frame and door unit with door hardware, <br />closer, and weather stripping <br />• Exterior stairs <br />0 11'2" elevation. <br />0 4' x 4'6" platform with toe kick <br />0 2 rail handrail at 2 sides of platform, one side of stair <br />o Wall rail at existing building down one side of stair <br />o Serrated grating at platform <br />o Serrated tread for stair (17 ea) <br />o Four (4) 4x4 steel columns for platform <br />o Anchor bolts for columns <br />o Bolts for treads and bottom of stringers <br />o Materials primed and painted <br />o Sidewalk for stair landing approx 14' long x 47" wide <br />o Pour footing approx 4' x 4'-7" <br />Sprinkler system <br />o relocate one to hallway from Conference room <br />o two new sprinkler heads in new area of hallway <br />. ~ 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.