My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
11 November
>
11/14/11
>
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 4:14:14 PM
Creation date
11/10/2011 2:36:48 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Acoustical Ceiling <br />o Armstrong Prelude Fire rated grid system <br />o Armstrong Fine Fissured Fire rated 2 x 4 ceiling tiles <br />• Electrical <br />o Move (2) 2x4 lay in fluorescent fixtures from the Conference room <br />o Remainder of 2x4 lay in corridor lighting to be new fixtures <br />o Exit light at the end of corridor <br />o Re-work any light switch issues due to moving room entry points <br />• HVAC <br />o Relocate duct in chase approx 4' over from existing chase <br />o Relocate 4 supply and or / return grills for remodel <br />• Flooring <br />o Install VCT floor tile at new corridor area <br />o Patch VCT at wall demo area <br />o Install 4" rubber base on new wall <br />• Paint <br />o Tape /bed /texture /paint new walls <br />o Paint new interior and exterior doors <br />• Other <br />o General liability and workers compensation insurance <br />o Construction site area cleaned <br />o Dumpster for construction debris <br />o Daily construction safety program <br />Exclusions <br />• Not responsible for detection or removal of asbestos or other hazardous <br />materials <br />• Sales Tax <br />• Permits <br />Clarifications: <br />• Finishes (flooring and paint) will not match exactly due to the age of the existing, <br />product samples will be supplied for Owner selections. <br />Quote: $ 31,560.00 <br />We appreciate the opportunity to look at this project. Please call if you have any <br />questions or have any other projects you like for us to review. <br />Respectfully submitted, <br />We Build, Inc. <br />Building Systems Departmenf <br />Rhonda Welch <br />Project Manager <br />903-785-1653 <br />Keith Saufferer <br />Project Superintendent <br />8 Iq 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.