Laserfiche WebLink
• Acoustical Ceiling <br />o Armstrong Prelude Fire rated grid system <br />o Armstrong Fine Fissured Fire rated 2 x 4 ceiling tiles <br />• Electrical <br />o Move (2) 2x4 lay in fluorescent fixtures from the Conference room <br />o Remainder of 2x4 lay in corridor lighting to be new fixtures <br />o Exit light at the end of corridor <br />o Re-work any light switch issues due to moving room entry points <br />• HVAC <br />o Relocate duct in chase approx 4' over from existing chase <br />o Relocate 4 supply and or / return grills for remodel <br />• Flooring <br />o Install VCT floor tile at new corridor area <br />o Patch VCT at wall demo area <br />o Install 4" rubber base on new wall <br />• Paint <br />o Tape /bed /texture /paint new walls <br />o Paint new interior and exterior doors <br />• Other <br />o General liability and workers compensation insurance <br />o Construction site area cleaned <br />o Dumpster for construction debris <br />o Daily construction safety program <br />Exclusions <br />• Not responsible for detection or removal of asbestos or other hazardous <br />materials <br />• Sales Tax <br />• Permits <br />Clarifications: <br />• Finishes (flooring and paint) will not match exactly due to the age of the existing, <br />product samples will be supplied for Owner selections. <br />Quote: $ 31,560.00 <br />We appreciate the opportunity to look at this project. Please call if you have any <br />questions or have any other projects you like for us to review. <br />Respectfully submitted, <br />We Build, Inc. <br />Building Systems Departmenf <br />Rhonda Welch <br />Project Manager <br />903-785-1653 <br />Keith Saufferer <br />Project Superintendent <br />8 Iq 2 <br />