Laserfiche WebLink
<br />, <br />, <br /> <br />PRELIMINARY OPINIONS OF COST" . , ".,' " , . "" "... " : <br />F,OROPTION I ~ NORTH AND WEST SHORE DEVELOPMENT. ' " . " i <br />LAKE CROOK STUDY' '. .,' ,'. , ' " ' ,,12 JUNE 2001 . ¡ <br /> <br /> <br />he following information is intended to show the relative costs of development under this scheme versus other options and <br />s based on the consultanfs experience. Actual costs may be higher or lower than these preliminary estimates. Estimates <br />re not based on substantial engineering surveys and data which may later reveal obstacles or possible savings in cost <br /> <br />em Description <br /> <br />Concrete Paved Streets and Sewer System <br />NORTH SHORE: <br />1 Clearing and grubbing of rights of way <br />2 Drainage structures; culverts and inlets; headwalls <br />3 Roadway shaping, excavating, filling, and compacting <br />4 On-site water lines; 6- - 12- size; fire hydrants, valves <br />5 Off.site 12- water line from plant to new ground storage <br />6 0.5 mgal ground storage; pressure pumping station <br />7 On-site sanitary sewer lines; 6"-8- size; manholes; cleanouts <br />8 Submersible pump liftstations; force mains; wetwells <br />9 Off.site 12- gravity sanitary sewer to existing trunk <br />10 Dry bore and casing; U.S. 271 <br />11 Monolithic concrete curb <br />12 Reinforced concrete pavement <br />13 Entry way signage; lighting; street signs; traffic signs <br />14 Landscaping entrances and common areas; irrigation <br /> <br />.... <br /> <br />WEST SHORE: <br />1 Clearing and grubbing of rights of way <br />2 Drainage structures; culverts and inlets; headwalls <br />3 Roadway shaping, excavating, filling, and compacting <br />4 On-site water lines; 6- - 12- size; fire hydrants, valves <br />5 Off-site 12- water line <br />7 On.site sanitary sewer lines; S-.8- size; manholes; cleanouts <br />8 Submersible pump liftstations; force mains; wetwells <br />9 Off-site ë force main to North Shore <br />11 Monolithic concrete curb <br />12 Reinforced concrete pavement. <br />13 Entry way signage; lighting; street signs; traffic signs <br />1 ~ Landscaping entrances and common areas <br /> <br />Subtotal Construction <br />Surveying, platting, staking <br />Engineering <br />Contingency (10%) <br /> <br />Estimated Units <br />Quantity <br /> <br />45.1 acres <br />25 ea <br />330 sta. <br />33000 IJ . <br />6000 IJ . <br />1 LS <br />30000 IJ . <br />5 ea. <br />11000 IJ. <br />200 IJ. <br />66000 IJ . <br />121000 s.y. <br />1 LS <br />1 LS <br /> <br />Unit <br />Price <br /> <br />Total <br /> <br />$8,000 <br />12,500 <br />2,500 <br />22 <br />32 <br />350,000 <br />25 <br />85 , 000 <br />34 <br />160 <br />6 <br />25 <br />40000 <br />80000 <br /> <br />$360,800 <br />312,500 <br />825,000 <br />726,000 <br />192,000 <br />350,000 <br />750,000 <br />425,000 <br />374,000 <br />32,000 <br />396,000 <br />3,025,000 <br />40,000 <br />80,000 <br /> <br />$7,888,300 <br /> <br />18.9 acres $8,000 $151,200 <br />12 ea 12,500 150,000 <br />14 sta. 1,500 21,000 <br />1 4000 IJ. 22 308,000 <br />3000 IJ. 32 96 , 000 <br />14000 IJ. 25 350,000 <br />1 ea. 85 ,000 85 , 000 <br />3000 .f. 20 60 , 000 <br />28000 IJ. 6 168,000 <br />51400 s.y. 25 1,285,000 <br />1 LS 20000 20000 <br />1 LS 40000 40000 <br /> $2,734,200 <br /> $ 10,622,500 <br /> 133,200 <br /> 333,000 <br /> 1,062,250 <br /> $ 12150950 <br /> <br />Total Cost: Construction a tion I <br />