<br />" <br /> <br />. ' <br /> <br />PRELIMINARY OPINIONS OF' COST, . , ' , " , ' ", , . . : <br />FOR OPTION 3 - NORTH AND WEST SHORE DENSITY DEVELOPMENT' <br />LAKE CROOK STUDY. . ' .,' ." ' " '12 JÙNE 2001 <br /> <br /> <br />he following information is intended to show the relative costs of development under this scheme versus other options and <br />s based on the consultant's experience. Actual costs may be higher or lower than these preliminary estimates. Estimates <br />re not based on substantial engineering surveys and data which may later reveal obstacles or possible savings in cost. <br /> <br />Item <br /> <br />Description <br /> <br />NORTH SHORE: <br />1 Clearing and grubbing of rights of way <br />2 Drainage structures; culverts and inlets; headwalls <br />3 Roadway shaping, excavating, filling, and compacting <br />4 On-site water lines; 6" - 1 Z' size; fire hydrants, valves <br />5 Off-site 1 Z' water line from plant to new ground storage <br />6 0.5 mgal ground storage; pressure pumping station <br />7 On-site sanitary sewer lines; 6"-8" size; manholes; cleanouts <br />8 Submersible pump liftstations; force mains; wetwells <br />9 Off-site 12" gravity sanitary sewer to existing trunk <br />10 Dry bore and casing; U.S. 271 <br />11 Reinforced concrete pavement <br />12 Entry way signage; lighting; street signs; traffic signs <br />12 Landscaping entrances and common areas; irrigation <br />14 Monolithic concrete curb <br /> <br />.... <br /> <br />Subtotal for North Shore: <br /> <br />WEST SHORE UNIT I: <br />1 Clearing and grubbing of right's of way <br />2 Drainage structures; culverts and inlets; headwalls <br />3 Roadway shaping, excavating, filling, and compacting <br />4 On-site water lines: 6" - 1 Z' size; fire hydrants, valves <br />5 Off-site 1 Z' '",ater line <br />7 On-site sanitary sewer lines; 6"-8" size; manholes; cleanouts <br />8 Submersible pump liftstations; force mains; wetwells <br />9 Off-site 6" force main to North Shore <br />11 Reinforced concrete pavement <br />12 Monolithic concrete curb <br />13 Entry way signage; lighting; street signs; traffic signs <br />14 Landscaping entrances and common areas <br /> <br />Estimated Units Unit Total <br />Quantity Price <br />58 acres $8,000 $ 454 , 000 <br />40 ea 12,500 500 . 000 <br />420 sta. 1,500 630 , 000 <br />42000 l.f. 22 924,000 <br />6000 I.f. 32 192,000 <br />1 LS 350 , 000 350 , 000 <br />4 OCOO I.f. 25 1 ,000,000 <br />5 ea. 85 ,000 425,000 <br />11000 I.f. 34 374,000 <br />200 l.f. 160 32,000 <br />154000 s.y. 25 3,850,000 <br />1 LS 40000 40 , 000 <br />1 LS 80000 80,000 <br />84000 I.f. 6 504 ,000 <br /> $ 9,365,000 <br /> <br />45.5 acres <br />30 ea <br />330 sta. <br />33000 I.f. <br />3000 I.f . <br />35000 I.f . <br />1 ea. <br />3000 I.f . <br />121000 s.y. <br />66000 I.f. <br />1 LS <br />1 LS <br /> <br />$8,000 <br />12,500 <br />1,500 <br />22 <br />32 <br />25 <br />85,000 <br />20 <br />25 <br />6 <br />20000 <br />40000 <br /> <br />$364,000 <br />375,000 <br />495,000 <br />726,000 <br />96 , 000 <br />875,000 <br />85 , 000 <br />60 , 000 <br />3,025,000 <br />396,000 <br />20000 <br />40000 <br /> <br />Subtotal for Unit I <br /> <br />56,557 000 <br />