My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23-TDHCA HOME PROGRAM
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
23-TDHCA HOME PROGRAM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:27:14 AM
Creation date
5/11/2012 6:29:52 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Paris <br />HOME Program <br />Clariftcstion to bid Items <br />ClariBcAtlon regarding bid items: <br />Base Bid Apptiances: <br />• Refiigerator w/ice maker <br />• Range Oven Combination <br />• Re-circulating vent hood <br />HVAC c1ari8catlon: <br />• Heat Pump reyuired <br />OPTIONS clari8cation: There needs to be a minimum of 5 options homeowners may choose from for the <br />following items: <br />• Cabinet stains <br />• Hardwaze (must match light and plumbing fixtures and be consistent throughout the home) <br />• Floor (catpet and vinyl) <br />• Exterior paint trim -(colors that aro not "naturai" have to be appnoved prior to the pre-construction <br />conference. Examples include pfimary colors, fuchsia, and turquoise). <br />• Counter tops <br />• Brick colors <br />Aouse Plans: <br />' DmP ceiling in hallway is not required. <br />~ All bathrooms utiliu wall hung lavatories <br />• Window and LN rating; refer to City Code <br />• Construction Debris - This is the msponsibility of the builder <br />• Foundation - Refer to TX Minimum Construction Spe.cifications - Page 5, Item 6.5 Slab on Grade <br />or City Code, whichever is stricter <br />Note: The builder is responsiblc for all due diiigence and the uuderstanding of all City codes, ordinances and <br />permits required by the City and needs to bid accordingly. <br />Example: If the City requires a survey for foundation, setbac]cs or other testing required by the City <br />ordinances, the buiider is responsible for those costs. Please bid accordingly. <br />If you have any qnestions regarding any items, please cail Rachel Edwards with Resource Maaagemart & <br />Consulting Co. at 903/784-6439. <br />Sincerely, <br />Rachel Edwards <br />Resource Management 8t Consulting Co. <br />P.O. Box 6038Paris, TX 75461 <br />903/784-6439 <br />I ~ 203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.