My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(11) Cure test of interior completed. <br />D. The Contractor is required to coordinate with the inspector and to provide 24 <br />hours notice to request a hold-point inspection. Hold-point inspections shall <br />not be scheduled during weekends or Federal Holidays. <br />E. The Contractor shall submit daily weather and progress reports, including <br />anticipated work schedule for the next 7 days, to Engineer & Engineer's Field <br />Representative via email. <br />F. The Contractor is responsible for providing safe rigging to gain access to all <br />work areas to be inspected. All rigging must conform to OSHA Standard <br />1910. <br />G. The Contractor is responsible for providing recommended lighting per SSPC <br />Technology Guide 12 (See Guide in Appendix) to illuminate the work and <br />inspection areas. <br />H. If the Contractor does not provide adequate lighting or safe rigging to <br />properly inspect the work, the inspection will be postponed until such time as <br />the Engineer can schedule an inspection to determine if the work may <br />progress beyond the hold-point. <br />10. ALTERNATE COATING SYSTEMS <br />Contractors mav provide alternate pricing for the following coating systems: <br />A. Interior coating system: <br />Interior prime coat: Sherwin-Williams Corothane I Galvapac Zinc or <br />Induron Indurazinc MC 67 applied @ 2.5 - 3.5 mils DFT. <br />Interior stripe, intermediate & finish coat: Sherwin-Williams Macropoxy <br />646 PW or Induron PE 70 applied @ 4.0 to 6.0 mils DFT each coat. <br />Interior seam sealer & pit filler: Sherwin-Williams Steel Seam FT 910 or <br />Induron Aquatapoxy A-6. <br />Total interior system thickness must be 12.0 mils DFT minimum. <br />B. Exterior coating system: <br />Exterior prime coat: Sherwin-Williams Corothane 1 Galvapac Zinc or <br />Induron DF 67 applied at 2.5-3.5 mils DFT. <br />Exterior stripe and 1St intermediate coat: Sherwin-Williams Macropoxy 646 <br />PW or Induron Armorguard @ 4.0-5.0 mils DFT. <br />SW-12 <br />' 443 <br />