My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Method of Application: Apply paint materials by brush, roller or spray (air or <br />airless) as dictated by the manufacturer's instructions and as approved by the <br />Engineer. <br />When spraying, each coat shall be sprayed on in strict accordance with the <br />manufacturer's recommendations. The type of spray nozzle, the fluid pressure at <br />the gun, the air pressure at the gun, the distance from the gun to the surface being <br />painted and the speed of travel of the gun shall be exactly as recommended by the <br />manufacturer. Thinning shall be done as recommended by the manufacturer. All <br />paint in the fluid pot and lines shall be cleaned out with thinner before application <br />of the paint is begun. The thinner may be used also for cleaning the painting <br />equipment at the end of each day's painting operation. Each coat shall be dry to <br />touch before the next coat is applied. At least iwo hours drying time shall be <br />allowed between coats, however, it is best to follow the recommendation of the <br />manufacturer. The Contractor is cautioned that small amounts of the paint fumes <br />are intoxicating and large amounts tend to be toxic and fatal. The Contractor shall <br />make provisions to keep the tank well ventilated during the spraying and drying <br />operations to protect the personnel and to facilitate drying of the coating by <br />solvent evaporation. <br />20.07 INSPECTION <br />During the sandblasting, to whichever degree of cleanliness is specified, checks must be <br />continually made to insure that the cleanliness called for is being met; and that the <br />proper profile as required by the coating system to be utilized is being achieved. The <br />cleanliness is covered by the SSPC Visual Standards and the profile may be checked by <br />use of a Testex Micrometer Dial Thickness Gauge. <br />During and after each coating of paint, all ferrous metal surfaces shall be checked with <br />an Elcometer, Microtest, Posi-Test or other approved dry film thickness gauge to insure <br />that the specified dry film thickness has been attained. <br />After the paint thickness on the inside meets the required thickness of these <br />specifications, the Contractor shall furnish a holiday detector such as a Tinker and <br />Rasor, or other suitable instrument, and test the entire surface of the paint system for <br />holidays. This is done by connecting the holiday detector ground connection to the <br />shell of the tank and connecting the detector lead to a damp sponge mop and wiping it <br />over the surface of the tank. Areas where holidays are found shall be marked in chalk <br />and recoated. After recoating, the areas shall be again rechecked with the holiday <br />detector. If additional holidays are found, the areas shall be recoated and rechecked <br />until the entire surface is free of holidays. After the holiday checking is completed, the <br />point of ground connection of the holiday detector shall be thoroughly painted. <br />Holiday detection shall not be required on the exterior surface of the tank. <br />TS20-6 <br />. - 461 <br />
The URL can be used to link to this page
Your browser does not support the video tag.