B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, <br />shall be of good quality and new, except as otherwise provided in the Contract Documents. All <br />special warranties and guarantees required by the Specifications shall expressly run to the benefit <br />of Owner. If required by Engineer, Contractor shall furnish satisfactory evidence (including <br />reports of required tests) as to the source, kind, and quality of materials and equipment. <br />C. All materials and equipment shall be stored, applied, installed, connected, erected, protected, <br />used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except <br />as otherwise may be provided in the Contract Documents. <br />6.04 PYOgress Schedule <br />A. Contractor shall adhere to the Progress Schedule established in accordance with Paragraph 2.07 <br />as it may be adjusted from time to time as provided below. <br />Contractor shall submit to Engineer for acceptance (to the extent indicated in Paragraph 2.07) <br />proposed adjustments in the Progress Schedule that will not result in changing the Contract <br />Times. Such adjustments will comply with any provisions of the General Requirements <br />applicable thereto. <br />2. Proposed adjustments in the Progress Schedule that will change the Contract Times shall be <br />submitted in accordance with the requirements of Article 12. Adjustments in Contract Times <br />may only be inade by a Change Order. <br />6.05 Substitutes and "Or-Equals " <br />A. Whenever an item of material or equipment is specified or described in the Contract Documents <br />by using the name of a proprietary item or the name of a particular Supplier, the specification or <br />description is intended to establish the type, function, appearance, and quality required. Unless <br />the specification or description contains or is followed by words reading that no like, equivalent, <br />or "or-equal" item or no substitution is permitted, other items of material or equipment or <br />material or equipment of other Suppliers may be submitted to Engineer far review under the <br />circumstances described below. <br />"Or-Equal " Items: If in Engineer's sole discretion an item of material or equipment proposed <br />by Contractor is functionally equal to that named and sufficiently similar so that no change in <br />related Work will be required, it may be considered by Engineer as an "or-equal" item, in <br />which case review and approval of the proposed item may, in Engineer's sole discretion, be <br />accomplished without compliance with some or all of the requirements for approval of <br />proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of <br />material or equipment will be considered functionally equal to an item so named if: <br />a. in the exercise of reasonable judgment Engineer determines that: <br />1) it is at least equal in materials of construction, quality, durability, appearance, <br />strength, and design characteristics; <br />EJCDC C-700 Standard General CondiHons of the Construction Contract <br />Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Paae 23 of 62 <br />387 <br />