2) it will reliably perform at least equally well the function and achieve the results <br />imposed by the design concept of the completed Project as a functioning whole; and <br />3) it has a proven record of performance and availability of responsive service. <br />b. Contractor certifies that, if approved and incorporated into the Work: <br />1) there will be no increase in cost to the Owner or increase in Contract Times; and <br />2) it will conform substantially to the detailed requirements of the item named in the <br />Contract Documents. <br />2. Substitute Items: <br />a. If in Engineer's sole discretion an item of material or equipment proposed by Contractor <br />does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it will be considered a <br />proposed substitute item. <br />b. Contractor shall submit sufficient information as provided below to allow Engineer to <br />determine if the item of material or equipment proposed is essentially equivalent to that <br />named and an acceptable substitute therefor. Requests for review of proposed substitute <br />items of material or equipment will not be accepted by Engineer from anyone other than <br />Contractor. <br />c. The requirements for review by Engineer will be as set forth in Paragraph 6.05.A.2.d, as <br />supplemented by the General Requirements, and as Engineer may decide is appropriate <br />under the circumstances. <br />d. Contractor shall make written application to Engineer for review of a proposed substitute <br />item of material or equipment that Contractor seeks to furnish or use. The application: <br />1) shall certify that the proposed substitute item will: <br />a) perform adequately the functions and achieve the results called for by the general <br />design, <br />b) be similar in substance to that specified, and <br />c) be suited to the same use as that specified; <br />2) will state: <br />a) the extent, if any, to which the use of the proposed substitute item will prejudice <br />Contractor's achievement of Substantial Completion on time, <br />b) whether use of the proposed substitute item in the Work will require a change in <br />any of the Contract Documents (or in the provisions of any other direct contract <br />with Owner for other work on the Project) to adapt the design to the proposed <br />substitute item, and <br />EJCDC C-700 Standard General Conditions of the ConstrucHon Contract <br />Copyright O 2007 Nationai Society of Professional Engineers for EJCDC. All rights reserved. <br />Pa¢e 24 of 62 _ <br />` . 388 <br />